True TBB-2-HC Installation Manual Download Page 1

TEC_TM_114 | REV. A | EN

04/26/2021 

Page 1 of 28

UNDERBAR REFRIGERATION

INSTALLATION MANUAL

TDB-24-48-1-G-1-HC

TRUE

 

MANUFACTURING CO., INC.

TD-50-18-S-HC

TBB-2-HC

TBB-3G-S-HC

TDD-4-HC

North America – Canada  

and Caribbean

Warranty Phone: +1 855 878 9277

Warranty Fax: +1 636 980 8510

Technical Phone: +1 855 372 1368

Warranty Email: 

 [email protected]

Technical Email:

 [email protected]

7:00 – 7:00 CST Monday – Thursday.

7:00 – 6:00 Friday. 8:00 – 12:00 Saturday.

Mexico

Phone: +52 555 804 6343/44

Toll Free in Mexico: 01 800 202 0687

[email protected]

9:00 am – 5:30 pm M–F

Latin America

Phone: +56 232 13 3600

[email protected]

9:00 am – 5:30 pm M–F

UK, Ireland, Middle East, 

Africa and India

Phone: +44 (0) 800 783 2049

[email protected]

8:30 am – 5:00 pm M–F

European Union and 

Commonwealth of 

Independent States

Phone: +49 (0) 7622 6883 0

[email protected]

8:00 am – 5:00 pm M–F

Australia

Phone: +61 2 9618 9999

[email protected]

8:30 am – 5:00 pm M–F

INSTALLATION MANUAL

UNDERBAR REFRIGERATION

Original Instructions

TRUE MANUFACTURING CO., INC.

2001 East Terra Lane • O’Fallon, Missouri 63366-4434
(636)-240-2400 • FAX (636)-272-2408 • International FAX (636)272-7546 • (800)-325-6152
Parts Department (800)-424- TRUE • Parts Department FAX# (636)-272-9471

Congratulations!

You have just purchased the finest commercial refrigerator available.  

You can expect many years of trouble-free operation.

Table of Contents

Safety Information

Safety Precautions & Proper Disposal ................................................................... 3

Prior to Installation

Ownership ...................................................................................................................... 4
Cabinet Specification & Location ........................................................................... 4
Notice to Customer ..................................................................................................... 4
Wire Gauge Chart ......................................................................................................... 4

Installation

Uncrating ......................................................................................................................... 5
TBB/TDD-1-HC Pallet Removal ................................................................................ 6
Leveling Leg, 6” Leveling Leg & Castor Installation ......................................... 7
Leveling & Sealing the Cabinet to the Floor ...................................................... 8
Electrical Installation & Safety ................................................................................. 9

Cabinet Setup

Standard Accessories & Shelf Installation ........................................................  10
Direct Draw Draft Arm Installation .....................................................................  11
CO2 Pressure ................................................................................................................  11

Kegerator Installation ..............................................................................................  11

Cabinet Operation

Startup, Temperature Control & Light Switch Location ..............................  15
General Sequence of Operation ..........................................................................  16
Draft Beer Storage, Handling & Operation ......................................................  17
Draft Beer Problems & Troubleshooting ...........................................................  18
Changing CO2 Gas Cylinder & Regulator Pressure Adjustment ...............  19

Maintenance, Care & Cleaning

Draft Tower Cleaning ...............................................................................................  20
Condenser Coil Cleaning & Important Warranty Information ..................  21
Stainless Steel Care & Cleaning ............................................................................  23

Cabinet Adjustments, Servicing & Component Replacement

Servicing & Replacing Components...................................................................  24
Slide Door Operation ...............................................................................................  25

Warranty

Warranty .......................................................................................................................  27

Summary of Contents for TBB-2-HC

Page 1: ...4 636 240 2400 FAX 636 272 2408 International FAX 636 272 7546 800 325 6152 Parts Department 800 424 TRUE Parts Department FAX 636 272 9471 Congratulations You have just purchased the finest commercia...

Page 2: ...iance DO NOT store explosive substances such as aerosol cans with a flammable propellant in this appliance Keep fingers out of the pinch point areas clearances between the doors and cabinet are necess...

Page 3: ...90 100 120 140 160 5 14 14 14 14 14 14 14 14 14 14 14 14 6 14 14 14 14 14 14 14 14 14 14 14 12 7 14 14 14 14 14 14 14 14 14 14 12 12 8 14 14 14 14 14 14 14 14 14 12 12 12 9 14 14 14 14 14 14 14 14 12...

Page 4: ...ed Installing Leveling Legs Leveling legs are provided to assist with leveling the cabinet With access to the bottom of the cabinet thread the leveling legs into the holes used to secure the cabinet t...

Page 5: ...ower cord from this appliance is equipped with a grounding plug which minimizes the possibility of electric shock hazard The wall outlet and circuit should be checked by a licensed electrician to make...

Page 6: ...Pressure Regulator i Beer Tappers j 5 16 I D x 9 16 O D Clear Vinyl Tubing with Clamps 36 914 4 mm TDB 1 kit only Required Tool s Phillips Screwdriver Adjustable Wrench 1 4 Socket Wrench Leak Check So...

Page 7: ...nnect the clear vinyl hose to the tapper See fig 11 15 Open the pressure regulator valve and pressurize the system 16 It requires 1 2 lb 0 23 kg of CO to dispense a half barrel of beer at 38 F 3 3 C w...

Page 8: ...emperature Control or Electronic Temperature Control without Digital Display Inside right wall or back wall Cabinet Setup cont This instruction is TRUE s recommended procedure for installing a remote...

Page 9: ...ill use the evaporator fans to clear the coil during defrost EXCEPTION Models TSID TDBD and TCGG do not have an evaporator fan s A freezer will use heaters to clear the evaporator coil during defrost...

Page 10: ...eplace a CO gas cylinder Procedure 1 Close cylinder valve A 2 Remove tap head D from the barrel Pull the pressure release ring on the body of the tap to release pressure remaining in the line DO NOT c...

Page 11: ...e keg Beer Tap Cleaning Kit Required Tools BLC System Cleaner Brush Pump Bottle Tube Spanner Wrench Rubber Gasket Bucket Fresh Water Rubber Gasket Fig 1 Carefully remove the faucet Fig 2 Drain the bee...

Page 12: ...Specialty Kitchen Degreaser or Simple Green Industrial Cleaner Degreaser are excellent for removal of grease fatty acids blood and burnt on foods on all surfaces DO NOT use detergents or degreasers wi...

Page 13: ...r out of the bottom channel See fig 4 Two Door units skip to step 5 3 Slide the right door to the left and align the left edge with the beginning of the TRUE Logo at the top of the door frame see fig...

Page 14: ...ned for servicing An OEM exact replacement should be used The new drier must also be the same capacity as the drier being replaced 3 Micron level vacuums must be achieved to ensure low moisture levels...

Page 15: ...04 26 2021 Page 28 of 28 TEC_TM_114 REV A EN www truemfg com EA BP_975552_03 2021...

Reviews: