True Fitness Technology • O’Fallon, MO • Phone: 800-426-6570/636-272-7100 • Truefitness.com
Page # 28 of 53
CHAPTER 2: ASSEMBLY GUIDE
Strength
Atlas 200/201
REQUIRED ASSEMBLY STEPS:
Step 2 (Half Rack Configuration):
Assemble the optional band peg kit
to the Half Rack using the identified
hardware.
Note: The band peg kit option is used
only when the Half Rack option is used.
Item
Part Number
Description
Quantity
1
C-623
SHCS, 5/8”-18, 1-1/4”
4
2
PSXFW83-BPG
Band Peg Kit
4