3-12
SITE PREPARATION/GAUGE POSITIONING
Preparation of the test site surface is critical to gauge performance.
This section provides site preparation procedures for both soils and
base courses and asphalt surfaces. To ensure the most accurate
gauge readings, the appropriate preparation procedure should be
followed.
SOIL AND BASE COURSE PREPARATION
✓
Since soil surface conditions are critical to accurate
measurements, locate a level site free from any large holes,
cracks, or debris.
✓
Smooth the surface by moving the scraper plate in a back and
forth motion. Filler such as fine sand may be used to decrease
the surface voids.
NOTE
Use only enough filler to fill the voids. Too much filler
will cause an error in the measurement.
✓
For direct transmission measurements, put the drill rod through
the extraction tool and then through one of the guides on the
plate (see Figure 3-4).
Figure 3-4. Drill Rod Positioning
Summary of Contents for 3430-M
Page 9: ......
Page 14: ...xii NOTES...
Page 19: ...Model 3430 1 5 Figure 1 1 Model 3430 Gauge and Accessories INTRODUCTION...
Page 22: ...1 8 NOTES...
Page 26: ...2 4 Figure 2 3 Backscatter Surface Density Effects Top Layer Effect Curves...
Page 28: ...2 6 Figure 2 4 Effect of Moisture on Depth of Measurement...
Page 48: ...3 20 NOTES...
Page 62: ...4 14 NOTES...
Page 66: ...5 20 D xxxx M xxxx Use keys Moist R xxxx to view data Moist Avg xxxx to view data...
Page 88: ...A 14 NOTES...
Page 111: ...Model 3430 C 17 Figure C 2 3430 Gauge Assembly MAINTENANCE...
Page 115: ...Model 3430 C 21 Figure C 5 3430 Gauge Preamplifier Assembly MAINTENANCE...
Page 117: ...Model 3430 C 23 Figure C 6 3430 Gauge Scaler Assembly MAINTENANCE...
Page 128: ...E 2 Date MS DS Date MS DS STANDARD COUNT LOG Gauge Serial Number...
Page 129: ...Model 3430 E 3 Date MS DS Date MS DS STANDARD COUNT LOG Gauge Serial Number STANDARD COUNT LOG...
Page 130: ...E 4 Date MS DS Date MS DS STANDARD COUNT LOG Gauge Serial Number...
Page 140: ...Index 8 NOTES...