background image

Product overview

Fig. 1: Chilled ceiling WK-D-WF, example

1

Specially formed blade

2

Pipe (serpentine)

3

Fixing bracket

Important notes

Information on the installation manual

This manual enables operating or service personnel
to correctly install the product described below and
to use it safely and efficiently.

It is essential that these individuals read and fully
understand this manual before starting any work.
The basic prerequisite for safe working is to comply
with the safety notes and all instructions in this
manual.

The local regulations for health and safety at work
and general safety regulations also apply.

Safety

Correct use

Cooling panels are primarily used for the cooling of
internal spaces; they use water to dissipate thermal
loads.

They can, however, be combined with a ventilation
system and be used for heating.

Incorrect use

 WARNING!

Danger of injury or risk of damage to property
due to incorrect use!

Incorrect use of the cooling panels can lead to
dangerous situations.

Do not use cooling panels:

in areas with potentially explosive atmos-
pheres

outdoors

in humid rooms

in rooms with aggressive or dust-laden air

at temperatures below the dew point

Modifying the unit or using replacement parts that
have not been approved by TROX is not permitted.

Staff

Qualification

The work described in this manual has to be carried
out by individuals with the qualification, training,
knowledge and experience described below:

Drywall installer

Drywall installers build indoor and outdoor drywall
(also called plasterboard) constructions, e.g. light-
weight partition walls, that meet the requirements
for thermal insulation, noise insulation, fire protec-
tion and protection from radiation. They also fit clad-
ding to walls and ceilings, for example plasterboard,
metal panels or wood, and insert the necessary
insulation.

Installation manual

GB/en

Chilled ceiling

WK-D-WF

TROX GmbH

Heinrich-Trox-Platz
47504 Neukirchen-Vluyn, Ger-
many
Germany
Phone: +49 (0) 2845 2020
+49 (0) 2845 202-265
E-mail: [email protected]
http://www.troxtechnik.com

A00000087742, 03/2022, 

©

 2021 TROX GmbH

Chilled ceiling WK-D-WF

1

Summary of Contents for WK-D-WF

Page 1: ...panels can lead to dangerous situations Do not use cooling panels in areas with potentially explosive atmos pheres outdoors in humid rooms in rooms with aggressive or dust laden air at temperatures b...

Page 2: ...d Personal protective equipment Personal protective equipment is equipment that protects the user against health or safety risks at work Personal protective equipment must be worn for various types of...

Page 3: ...e note Store the product only in its original packaging Protect the product from the effects of weather Protect the product from humidity dust and contamination Storage temperature 10 C to 40 C Relati...

Page 4: ...intended load Use preferably threaded rods or suitable rail systems for suspension Use all the provided suspension points Stand clear of suspended loads unless prop erly secured Check secure fixing af...

Page 5: ...iling installation in continuous ceilings is possible with or without adjacent gaps The cooling capacity that can be achieved depends on the structure of the ceiling Installation with gaps allows for...

Page 6: ...DANGER Risk of scalding Working on the hot water system carries a risk of scalding Only specialist personnel should work on the water side connections Before working on the water side connec tions shu...

Page 7: ...lation and then at regular intervals NOTICE Risk of damage to the copper serpentine due to freezing water If the chilled ceiling is not used after the system has been filled subzero temperatures may l...

Page 8: ...on Note Fix the product only to load bearing structural elements Load suspension systems only with the weight of the product Adjacent components and con necting ducts must be supported separately Use...

Page 9: ...24 5 1500 9 5 14 18 5 23 28 33 2000 11 5 17 23 28 5 34 5 40 2500 14 5 22 29 36 5 43 5 51 3000 17 25 33 5 42 50 58 5 3500 19 28 5 38 47 5 57 66 5 4000 21 32 42 5 53 63 5 74 j No of blades k L BN mm Wei...

Page 10: ...nsure that the panels have been correctly fixed and connected to air terminal devices if any Ensure that the water system has been filled and vented Carry out a leakage test with air or water and acco...

Reviews: