Trox Technik EM-TRF Operating And Installation Instruction Manual Download Page 7

7

EM-TRF · EM-TRF-USV Operating and Installation Manual / Leaflet no. M375EV5 (

8/2018

)

Delivery check

Check delivered items immediately after arrival for

transport damage and completeness. In case of 

any damage or an incomplete shipment, inform the

shipping company and your TROX contact person

immediately.
A complete shipment includes:
• Expansion module PCB
• PCB connection plug
• Safety latch
• Fixing screws
• Operating and installation manual 

Additionally for the EM-TRF-USV expansion

module:
• Battery pack with connecting cable and plug
• Fixing bracket
• Fixing screws

Transport on site

• If possible, take the expansion module in the

transport packaging up to the installation location.

• Do not remove the protective wrapping until just

before installation.

Storage

If you need to store the expansion module 

temporarily, make sure that the following conditions

apply:
• Leave the unit in its packaging and do not expose

it to the effects of weather.

• Store the unit in a dry place and away from 

direct sunlight.

• Temperature: –10°C to +70°C 

Maximum humidity: 90% (non-condensing)

Packaging

Properly dispose of packaging material.

4 Transport, storage and packaging

Summary of Contents for EM-TRF

Page 1: ...flet no M375EV5 8 2018 The art of handling air The art of handling air Operating and Installation Manual EASYLAB Expansion modules Type EM TRF for 230 V AC mains voltage Type EM TRF USV for 230 V AC m...

Page 2: ...Technical data ______________________ 6 4 Transport storage and packaging ________ 7 5 Installation __________________________ 8 Installing the EM TRF and EM TRF USV __ 8 Fitting the safety latch ____...

Page 3: ...sential to read this operating and installation manual before starting any work and to comply with it The manual must be given to the facilities manager when handing over the system The facilities man...

Page 4: ...ped with a transformer that has a comparatively high weight To avoid injury and damage be sure to grip the PCB properly and to handle it with care Installing the PCB Tighten the mounting screws only h...

Page 5: ...ansformer reduces this voltage to 24 V AC to be supplied to the controller and its modules An LED indicates whether voltage is being supplied Additional function of the EM TRF USV If the supply voltag...

Page 6: ...for an EASYLAB TAM adapter module Primary fuse 500 mA slow blow 250 V Terminal block Cable cross section up to 2 5 mm Acceptable temperature range for storage 10 to 70 C for operation 0 to 50 C Prote...

Page 7: ...xpansion module Battery pack with connecting cable and plug Fixing bracket Fixing screws Transport on site If possible take the expansion module in the transport packaging up to the installation locat...

Page 8: ...o avoid injury and damage be sure to grip the PCB properly and to handle it with care Installing the EM TRF and EM TRF USV Step 1 1 Interrupt the voltage supply to the TCU3 controller or TAM adapter m...

Page 9: ...a 230 V power supply is connected 1 Place the supplied safety latch on the casing 2 Drill a hole into the casing 3mm 3 Fix the latch with the supplied screw to the lid of the casing The casing can now...

Page 10: ...If necessary the bracket can be bent for fixing it to the control unit 5 Installation Installation examples Battery pack Screw Bracket VAV terminal unit Important Be careful when fixing the brackets...

Page 11: ...the EM TRF and EM TRF USV Never connect two voltages When the expansion module for 230 V AC is used do not connect a 24 V AC DC voltage to the main PCB Connect the 230 V AC supply voltage to the upper...

Page 12: ...onfiguration software provides a commissioning wizard that guides users in making project specific adjustments Maintain standard operation i e control function factory setting Close the control damper...

Reviews: