10173-17
5. ASSEMBLY STEPS
STEP 7
•
Thread the Upper Cable (63) through the pulley brackets of the unit as shown.
•
With Upper Cable (63) in the groove of Pulley (54), install Pulley (2) into the bracket of Top Beam (5) using one 3/8” x 2”
Hex Bolt (74), two 3/8” Washers (90) and one 3/8” Lock Nut (85).
•
With Upper Cable (63) in the groove of Pulley (54), install pulley 3 into top of Pulley Bracket Plate (24) using one 3/8” x 2”
Hex Bolt (74), two 3/8” Washers (90) and one 3/8” Lock Nut (85).
•
With Upper Cable (63) in the groove of Big Pulley (55), install the Pulley (4) into the bracket of Top Beam (5) using one
3/8” x 1-3/4” Hex Bolt (101), two 3/8” Washers (90) and one 3/8” Lock Nut (85).
•
Attach bolt end of Upper Cable (63) to Weight Selection Rod (29) using one T3.0 x Ø13 x Ø32mm Washer (95) and one
T3.0 x Ø26 x Ø46mm Washer (96).
•
Attach ball end of Upper Cable (63) to Lat Bar (21) using two Chain Hooks (52) and one Chain (Short) (56).
Summary of Contents for VISION 350
Page 6: ...10173 6 3 HARDWARE LIST...
Page 7: ...10173 7 3 HARDWARE LIST...
Page 8: ...10173 8 3 HARDWARE LIST...
Page 20: ...10173 20 Step 9 5 ASSEMBLY STEPS...
Page 29: ...10173 29 11 EXPLODED DRAWING...