![TRITORC BPL 100 Operating And Maintenance Manual Download Page 2](http://html1.mh-extra.com/html/tritorc/bpl-100/bpl-100_operating-and-maintenance-manual_1169531002.webp)
东莞 东莞赛森特流体控制设备有限公司
Dongguan Suncenter Fluid Control Equipment Co.,Ltd
Figure 1. Typical installation loop diagram
All kinds of power units and testing equipment can be made according to customer
requirements.
1. Pneumatic triplet 2. Driving gas source switch 3. Liquid filter
4. Manual four
way valve 5. Air pressure regulating valve
6.Air driven liquid booster pump 7. Silencer
8. Pneumatic unloading valve
9. Pressure gauge
14. Hydraulic cylinder 15. Unidirectional valve
2 Installation
The driving pressure connection range of liquid booster pump is (1Bar-8.3Bar max).
DANGER!
Unauthorized modification or modification of the system (mechanical, hydraulic,
pneumatic, etc.) may cause damage to personnel and systems.
4.0 Operation
4.1
The working environment requires no dust and no corrosion.
4.2
Each booster pump is equipped with two L tripod, indicating that part of the notes are
installed and the space needs size.
4.3
Air Pressure Request
Solid particles
Pressure dew point
Maximum oil content
classification
μm
classification
℃
classification
mg/m3
6
≤ 5
4
≤ +3
2
≤ 0.1
Classification standard:ISO 8573-1