background image

SUDC Sequence Of Operation

SUDC208V42P30M,

SUDC208V42P40M  

SUDC208V42P60M  

& SUDC208V84P60M

1111 West 35th Street, Chicago, IL 60609 USA

773.869.1234 • www.tripplite.com

Copyright © 2010 Tripp Lite. All trademarks are the sole property of their respective owners.

The drawing illustrates power flow 

and sequence of operation of the 

bypass switch.  It is important to 

follow the procedure correctly 

to avoid damaging the UPS or 

dropping the critical load.

1

 

Put the UPS into bypass by 

 

  turning off the inverter (press the 

 

  red button then turn the manual 

 

  rotary switch to bypass on the 

 

  back of the UPS)

2

 

Using the Key, retract SW2 bolt 

 

  and close SW2

 

UPS

Out to 

Panel

Input Panel

SW2

SW3

SW1

Output

input

3

 

Using key, retract bolt and open SW3

4

 

Open SW1

The UPS is now in bypass. To return to normal operation, reverse the process.

The 30M/40M/60M suffix in the distribution center part number indicates an integral 3 

breaker maintenance bypass in the bottom of the cabinet.  The feature enables make-

before-break isolation of the UPS from the critical load for maintenance of the UPS. 

Reviews: