2
F
G
A
B
C
D
E
H
N
O
P
K
L
M
I
J
A
B
C
D
48/42U
1-1
Preparation
(continued)
Note: The hinge swivels
H
and 12 hinge swivel screws
L
are pre-installed in the vertical sections
A
through
D
.
Parts List
(If any parts are missing, contact Tripp Lite.)
A
Lower Left Vertical Section (1)
B
Lower Right Vertical Section (1)
C
Upper Left Vertical Section (1)
D
Upper Right Vertical Section (1)
E
Top Section (1)
F
Bottom Section (1)
G
1U Blanking Panels (3)
H
Hinge Swivels (6 - all pre-installed)
I
Hinges (4)
J
Cable Manager Brackets (2)
K
M6 x 12 mm Flat-Head Screws (8)
L
M6 x 12 mm Pan-Head Screws
and Washers (14 total - 12 pre-installed)
M
M5 x 10 mm Pan-Head Screws
and Washers (40)
N
Grounding Cable (1)
O
M5 x 20 mm Pan-Head Screws and
Washers (4)
P
M4 x 8 mm Pan-Head Screws
and Washers (8)
1 – Frame Assembly
Note: For 25U enclosures, you will use only the lower vertical sections
A
and
B
. You will not use the upper vertical sections
C
and
D
.
For 48U and 42U enclosures, you will use all four vertical sections.
(For 25U enclosures, skip this step.) Slide the lower left vertical
section
A
inside the upper left vertical section
C
as shown.
Repeat for the lower right vertical section
B
and the upper right
vertical section
D
. The vertical sections are not interchangeable,
so refer to the diagram to confirm that you’re assembling the
correct sections.