
3
Installation
Insert Keystone Jack
Notes:
• It is highly recommended that keystone jacks be installed after they
have terminated.
• Install keystone jacks in the top row first.
1
On the rear side of the patch panel, hook the terminated
keystone jack over the bottom ledge of the blank cutout.
2
Tilt the keystone jack into the port and press firmly on the
keystone jack latch. Using a flathead screwdriver or your
hands, secure the keystone jack by snapping it into the
cutout.
1
2