2
Table of Contents
1. Introduction
3
Features
3
2. Important Safety
4
Instructions
Installation and
4
Location Warnings
Connection Warnings
4
Battery Warnings
5
3. Battery Cabinet Installation 7
3.1 Preparation
7
3.2 Transportation
7
3.3 Mechanical Check
7
3.4 Internal Wiring (Typical)
8
3.5 Preliminary Electrical Check 8
(After Battery Installation)
3.6 Battery Cabinet Placement
8
3.7 Electrical Connection
9
3.8 Final Electrical Check
10
4. Operation and Charging
11
4.1 Determine Charging Voltages 11
4.2 Initial Charge
11
4.3 Operational Check
11
5. Maintenance
11
5.1 Maintenance Schedule
11
5.1.1 Quarterly Check
11
6. Mechanical Data
12
6.1 Physical Measurements
12
6.1.1 BP480V40/NIB
12
Measurements
6.1.2 BP480V65/NIB and
13
BP480V100/NIB
Measurements
6.2 Battery Requirements
14
6.2.1 BP480V40/NIB Battery 14
6.2.2 BP480V65/NIB Battery 14
6.1.3 BP480V100/NIB Battery 14
7. Installation
15
7.1 Battery Pre-Installation
15
7.2 Cable Jumpers and
16
Internal Wiring
7.2.1 Included Cable
16
Jumpers Specifications
7.2.2 Installing Cable Jumpers 17
to Battery Terminals
7.2.3 Battery Cabinet
18
Internal Wiring
7.3 Battery Installation
21
7.4 Installation Specifications
33
7.4.1 Installation and
33
Floor Loading Information
7.4.2 Recommended Torque
33
8. Storage and Service
34
9. Warranty
35
18-05-110-933861-EN.indd 2
7/3/2018 2:58:02 PM