5
3
Using the included hardware, attach the
mounting brackets to the forward mounting
holes of the cabinet. The mounting bracket
"ears" should face forward. (Some equipment
may have pre-installed or integrated mounting
brackets.)
4
With the aid of an assistant (if necessary), lift
the battery pack chassis and slide it into the
shelves. Attach the equipment mounting
brackets to the forward mounting rails with
user-supplied screws and washers
D
. Tighten
all screws securely.
Mounting (4-Post Rack)
3
4
D
D
Summary of Contents for AG-03F7
Page 33: ...33 1 1 2 3 2 3 1 2 3 4...
Page 34: ...34 o 4POSTRAILKIT 4POSTRAILKITHD 1 1 A B a e o a o o 1 A A A A B B 2 B C c 2 B C C C C B...
Page 35: ...35 3 a 4 D 3 4 D D...
Page 36: ...36 2POSTRMKITWM 2POSTRMKITHD BP192V12RT3US Tripp Lite 2 9USTAND 2 9USTAND 1 2 3...
Page 37: ...37 1 A B 4 3 2 1 1 2 A B 2 3 3 4 4 1...
Page 38: ...38 3 1 2 3 BP192V12RT3US 1 2 3 4 2 1 1 3 3 2 4 2 1 3...