Page 11 of 38
UPON COMPLETION OF MACHINE USE
After finishing your work and before any type of
maintenance is done, it is necessary to do the
following
:
1) Close the water valve by raising the solution
flow control lever.
2) Raise the brush base by stepping down
locking the brush base lift lever. To lock the
lever move your foot to the right while the
lever is pressed down.
3) Lift the squeegee by raising the squeegee lift
lever and locking it by moving the lever to the
left.
WARNING! The squeegee blades can
be damaged if the squeegee is not raised
during storage or transport.
4) Switch off the water solenoid valve switch.
5) Switch off the brush motor switch.
6) Switch off the vacuum motor switch.
7) Transport the machine to the location where
the recovery tank should be emptied.
8) Remove the drain hose at the front of the
recovery tank.
9) Remove the drain plug and empty the
recovery tank.
WARNING!
Use gloves for protection
from contact with dangerous solutions.
10) Remove the brushes or pad drivers and clean
them with clear water.
Squeegee
Lift Lever
Brush Base
Lift Lever
Solution
Flow
Control
Lever
Vacuum
Motor
Switch
Water
Solenoid
Switch
Battery Charge
Indicator
Brush Motor
Switch
Drain Plug
Solution
Tank
Drain
Hose
Summary of Contents for Ace 20BA
Page 18: ...Page 18 of 38 Brush Deck Assembly Drawing 1 ...
Page 20: ...Page 20 of 38 Brush Base Assembly Drawing 2 ...
Page 22: ...Page 22 of 38 Main Frame Assembly Drawing 3 ...
Page 24: ...Page 24 of 38 Squeegee Arm Assembly Drawing 4 ...
Page 26: ...Page 26 of 38 Squeegee Assembly Drawing 5 ...
Page 28: ...Page 28 of 38 Solution Tank Assembly Drawing 6 ...
Page 30: ...Page 30 of 38 Recovery Tank Assembly Drawing 7 ...
Page 32: ...Page 32 of 38 Vacuum Assembly Drawing 8 ...
Page 34: ...Page 34 of 38 Switch Box Assembly Drawing 9 ...
Page 36: ...Page 36 of 38 Electrical Schematic Drawing 10 ...