Trinity Tx
│
Installation and Operation Instructions
Tx Series
14
Figure 4-2(a) Near Boiler Vent Connections (PVC/CPVC)
Exhaust Vent Preparation (PVC/CPVC)
Near Boiler Venting (PVC/CPVC)
F
igure 4-2(b) Near Boiler Vent Connections (PPs – Polypropylene)
Exhaust Vent Preparation (PPs)
Near Boiler Venting (PPs)
Air-inlet
- check with applicable local codes for acceptable pipe material.
Flue Outlet
Adapter
(factory
supplied)
PVC/CPVC
Exhaust Vent
Swing Joint
to attain slope in
horizontal runs
Air-inlet
Pipe *
Air Inlet
Adapter
(factory
supplied)
PVC/CPVC
– w. 1/8” bevel
PPs Gasket & Ring
–
remove lower gasket &
ring (not used w/PVC)
PVC Gasket & Ring
– retain
upper gasket & ring
PPs Pipe
– w. 1/8”
bevel
PPs Gasket & Ring
–
retain lower gasket & ring
Air-inlet Adapter
(factory supplied)
PPs Elbow
w. offset angle to
account for slope
PPs Exhaust Vent
PPs Air-inlet Pipe*
Flue Outlet
Adapter
(factory supplied)
Summary of Contents for Tx101
Page 54: ...Trinity Tx Installation and Operation Instructions Tx Series 54 Figure 12 2 Field Wiring...
Page 81: ...Tx Series Installation and Operation Instructions Trinity Tx 81 NOTES...
Page 82: ...Trinity Tx Installation and Operation Instructions Tx Series 82 NOTES...
Page 83: ...Tx Series Installation and Operation Instructions Trinity Tx 83 NOTES...