Grounding/ (Potential equalization) 

Please observe the requirements and standards of the respective national directives for equipotential 
bonding. DIN VDE 0100-540 applies to grounding systems and protective conductors including protective 
equipotential bonding conductors with the aim of fulfilling the safety of electrical systems. 
TRIMAX Solar uses a frame made of anodized aluminum. Therefore, the modules should be connected to the 
protective equipotential bonding to prevent electric shock. 
Module frame and equipotential bonding must not be used as part of lightning protection. Have the lightning 
protection planned and installed by qualified specialists. Avoid electrical corrosion by taking appropriate 
measures. 
 
Grounding methods:  
The grounding conductor should be at least the 
same size as the electrical conductors. Grounding 
cables of not less than 4 mm² are recommended. The 
frame has pre-drilled holes marked with a grounding 
symbol. 
 

 

Figure 6: Grounding Symbol 

 

 

The grounding holes may only be used for 
grounding purposes and not for module 
mounting. 
 

 

Figure 7: Grounding 

 
Additional third-party grounding devices:  
TRIMAX PV modules can be grounded using third-party grounding devices. It is required that these devices 
are certified for grounding solar modules and are installed according to the manufacturer's instructions. 
 
 

Design substructure

 

 

 

For rooftop systems, always make sure the roof structure is suitable before installing the modules on 
a roof. 

 

Make sure that the modules do not overlap or exceed the size of the roof. 

 

Consider  the  thermal  linear expansion of the frames: The recommended minimum distance  between 
two modules is 1 cm. 

 

For ground-mounted systems, the recommended minimum distance from the ground to the bottom 
edge of the module is at least 50 cm.  

 

Provide  adequate  ventilation  under/behind  the  modules  to  cool  them.  A minimum  distance  of  10  cm 
between the roof level and the frame of the module is generally recommended. 

 

When  planning  the  final  arrangement  of  the  modules,  keep  a  suitable  access  area  free  to  facilitate 
maintenance and inspection work. 

 

Do not place the PV modules near air conditioning units or above ventilation outlets. 

 

Load capacity 

TRIMAX  PV  modules  can  be  installed  in  both  landscape  and  portrait  format.  Please  refer  to  the  load 
specifications for the individual module types in the next sections. Please note that this may vary depending 
on the mounting system and configuration. The specified values correspond to the design load according to 
IEC 61215: 2016. The cyclic load test is carried out according to the standard with the 1.5 times higher test 
load. The substructure should be made of durable, corrosion and UV resistant material.  Make sure that the 
installation method and the substructure can withstand the loading conditions. 

Summary of Contents for Solar TMX-MH7-120

Page 1: ...1 ANLEITUNG 04_21 INSTALLATION AND OPERATING INSTRUCTIONS TRIMAX Solar GmbH Leitzstra e 45 70469 Stuttgart GERMANY Tel 49 711 490 66 278 Mail info trimax solar com Web trimax solar com...

Page 2: ...ical installation 8 PLANNING AND INSTALLATION 9 Intended use 9 Shading 9 Tilt Angle 10 Glare behavior Glare assessment 10 Bifacial Modules 10 Electrical design 10 System dimensioning 11 Connectors 12...

Page 3: ...es and ensure that this manual is accessible to the operator at all times Pass the manual on to any subsequent owner or user of the solar modules We reserve the right to make changes to the product sp...

Page 4: ...the horizontal packing tapes 2 Place the pallets one by one 6 Carefully press the stack against a stand Not included 3 Remove the outer packing tapes 7 Cut the remaining packing tapes 4 Remove the co...

Page 5: ...ove the lid and detach the outer carton 6 Carefully press the stack against a stand Not included 3 Remove the outer carton 7 Cut the remaining packing tapes 4 Place the stand on the glass side of the...

Page 6: ...tructions including those given by other component suppliers Please contact our Technical Service if you have any questions about the instructions Fire protection TRIMAX Solar PV modules have been tes...

Page 7: ...r open fire or flammable and explosive gases substances Only use plugs and sockets of the same manufacturer and type Only use devices plugs cables and support frames that are suitable for use in a sol...

Page 8: ...current generation Do not install operate damaged modules as contact with the surface of the module or frame may cause electric shock Do not attempt to repair a module with broken glass or defective...

Page 9: ...plants or trees or soiled by soil Lightning protection is recommended for PV systems that are to be installed in locations with a high probability of lightning strikes Shading The modules should not...

Page 10: ...a professional provider for a glare assessment TRIMAX Solar high performance PV modules are coated with an ARC Anti Reflective Coating The glass coating with nano technology ensures that less light i...

Page 11: ...orientation of the module For this purpose a complete simulation for the specific site with long term weather data is required Maximum number of interconnected PV modules When modules are connected i...

Page 12: ...by the cable management system is not covered by the warranty When selecting the size of the cables connecting the module strings to the solar inverter observe the electrical parameters specified on...

Page 13: ...d according to the manufacturer s instructions Design substructure For rooftop systems always make sure the roof structure is suitable before installing the modules on a roof Make sure that the module...

Page 14: ...ing holes provided should be used Recommended to use corrosion resistant stainless steel screws 1 screw size and length M8x16mm 2 washer size M8 3 spring washer size M8 4 nut size M8 Torque 14 Nm 20 N...

Page 15: ...unting holes Mounting with clamping systems Mounting with clamp systems can be done on both sides of the module frame Use at least 4 clamps per module two on both long sides or two on each short side...

Page 16: ...ative 1800 Pa Table 9 Approved load capacity Clamping short side Mounting with insertion systems TRIMAX PV modules are compatible with insertion systems from selected manufacturers Installation method...

Page 17: ...on profile Figure 15 Insertion system Minimum overlap Load capacity support on the long sides Figure 16 Load capacity Insertion system long side Module Type Maximum mechanical load TMX MH7 120 TMX MH7...

Page 18: ...months to ensure they are clean secure and undamaged Check that mounting hardware terminal screws and grounding components are tight and not affected by corrosion Replacement modules must be of the s...

Page 19: ...ne must not be used Module at end of life Please hand in electrical equipment that is no longer required for disposal at the designated collection points For information on where to dispose of the equ...

Page 20: ...Insertion system long side 17 Figure 17 Load capacity Insertion system short side 17 List of Tables Table 1 Recommended unpacking method horizontally packed modules 4 Table 2 Recommended unpacking me...

Reviews: