![Trigano Auvents Panoramic 300 Erection Instructions Download Page 17](http://html1.mh-extra.com/html/trigano/auvents-panoramic-300/auvents-panoramic-300_erection-instructions_1162369017.webp)
5 - Once all poles have been inflated, take the ex-
tra tubes and inflate them following the same
instructions as for inflation of the poles.
For the model 300: 4 extra tubes
For the model 410: 6 extra tubes
Les faitières se positionnent aux endroits indiqués
sur les photos D et E.
Model Panoramic 300
6 - Position the inside roof lining (Fig F) on the top,
it will reduce the condensation.
C
ENGLISH
- 16 -
- 17 -
F
ROOF LINING
E
D
Model Panoramic 410
Notice PANORAMIC 300 ET 410.indd 17
06/02/2018 16:34
Summary of Contents for Auvents Panoramic 300
Page 10: ... 10 FRANÇAIS NOTIZEN Notice PANORAMIC 300 ET 410 indd 10 06 02 2018 16 34 ...
Page 20: ... 20 ENGLISH B NOTIZEN Notice PANORAMIC 300 ET 410 indd 20 06 02 2018 16 34 ...
Page 31: ...NOTIZEN 31 DEUTSCH Notice PANORAMIC 300 ET 410 indd 31 06 02 2018 16 34 ...
Page 32: ...NOTIZEN 32 DEUTSCH Notice PANORAMIC 300 ET 410 indd 32 06 02 2018 16 34 ...