- 22 -
TRICOR
Systems Inc.
At this point you may change to another UUT. Please note that you must put the UUT
connector into the same pins that were used to create the configuration file. To begin
testing, press the spacebar. Continue as before. Again press the space bar, and it will test
again. Move forward after it comes up, and again press other keys and so on and so forth.
All test results are saved to the .rst file (result file) you specify. (Figure 33) You may
finish the sample exercise by exiting now.
LED Voltage Test
After key test the voltage for the LEDs is verified. The
LED VOLTAGE TEST
RESULTS
window will appear offering three options. (Figure 34)
ABORT
/
NO
SAVE
(F9)
END
/
SAVE
(F6
)
CONTINUE
Click
CONTINUE
to continue the sample exercise.
Figure 34
Figure 33