background image

See Reverse Side For Specific Instructions On Installing The Manual Cyclic Pumps

TRICO MFG. CORP.  1235 HICKORY STREET, PEWAUKEE, WI 53072  TEL. (262) 691-9336  FAX (262) 691-2576

www.tricomfg.com

Read Instructions Before Installing

Read Instructions Before Installing

To Install: 

For information or technical assistance on the manual cyclic pumps or 
any other Trico products please call our toll free number at 800-558-7008 
(U.S. only) or call 414-691-9336 and ask for Customer Service.

61436     10/99

QUALITY SINCE 1917

QUALITY SINCE 1917

Manual Cyclic Pumps

PM-10 and PM-20 Series

Manual Cyclic Pumps

PM-10 and PM-20 Series

Obtain all available information from the system designer.  This may 
include a schematic diagram, bill of materials, lubrication point 
locations, etc..

1.

Mount the reservoir in the desired location.  It should be:

A.   Visible to the operator.
B.  Easy to re-fill and service.
C.  Located so that the handle can be fully activated.

2.

Mounting hole dimensions and clearances are shown on the backside.

3.

General installation practice is to mount the meter units at each 
lubrication point and interconnect them with tubing.  Always point  
arrow on meter unit in direction of flow.  Follow your system schematic.  
When connecting pipe threads apply a small amount of thread sealant to 
the external thread.  If  at all possible, the most distant lubrication point 
should be piped in an upward position from pump.

4.

Piping is done with metal or plastic tubing.  Take care to prevent dirt or 
contamination from entering into the piping.  You may choose to leave a 
final fitting (near the meter unit) slightly loose to facilitate the initial 
bleeding of air and checking of  oil delivery to each point.  Failure to 
observe oil at a point requires tracing the system back towards the 
pump in search of a kink in a line, a loose fitting, or other problems.

5.

Whenever actuating the pump, always move it through its total stroke.  To 
pre-fill the system, pump the handle until oil is observed at the most 
distant point.  Re-check all fittings for tightness.

6.

Always use clean oil poured from a clean container.  D o not mix oil types 
or change viscosity without consulting your machine manufacturer.

7.

Clean the reservoir and filter elements periodically as dictated by the oil 
cleanliness.  If  in doubt, check for cleanliness at 3 months, and then 6 
months.  Determine service frequency based  on what is found.

8.

If  contamination enters the system, disconnect lines and flush them out.  
Empty reservoir, clean filter elements and re-fill the system with clean 
lubricant.

9.

Specifications:

Selection Chart:

Dimensions:

PM-20 Series

PM-10 Series

Model No.

PM-1000-06

6

200

250

450

550

550

200

50

50

8

8

8

PM-1000-08

PM-2000-L

PM-2000-R

Pump 

Type

Vertical 

Mount

Horizontal 

Mount

Output

cc/stroke

Pressure 

(psi)

Capacity

(cc)

Reservoir Material

Cast Aluminum

PM-10 Series, manual piston pump
PM-20 Series, spring discharge piston pump

5/16-24 (f)

Pump Type

Output Connection

140 - 6 cc

85 - 6 cc

100 - 8 cc

8

6

 -

 6

 c

c

1

1

0

 -

 8

 c

c

1

6

7

 -

 6

 c

c

1

9

0

 -

 8

 c

c

140 - 8 cc

80

136

110

Dimensions in mm

Reviews: