10
4.1
Lifting tanks up to 4.6m long
•
Tanks up to 4.6m in length should be lifted using the eyebolts on the tank.
•
Tanks over 4.6m in length can be lifted using only lifting straps, as shown in Option 1. However, on
sites where lifting height is restricted, a lifting bar should be used as shown in Option 2:
•
To ensure the angle of the sling is not greater than 60
o
, as per option 1 above, the following sling
lengths are required:
Length of tank
Minimum length of sling
1.6
1.6
2.6
2.6
5
Installation
5.1
Installation Planning
Important
Prior to the installation of the Tricel Pumping Chamber, it is important to carefully read these installation
instructions.
•
When planning the installation of a Tricel Pumping Chamber, the following must be considered:
Backfill Considerations:
o
Is this a dry or wet site i.e. presence of a water table?
o
Which backfill material is appropriate for this
site?
o
What is the finished ground level and will risers be required?
Note:
If a riser is required, the installation may require a concrete backfill. If unsure of the
finished ground level, always use a concrete backfill as risers greater than 250mm
cannot be retrofitted without a concrete backfill.
Summary of Contents for Pumping Chamber 2600
Page 7: ...7...
Page 20: ...20...
Page 23: ...23 6 1 1 Operating Performance Tricel 75...
Page 24: ...24...
Page 26: ...26 6 2 1 Operating Performance GRI 11...
Page 35: ...35 Notes...