XCITE/BBC Installation Instructions TG200686 Issue 2 , 05-Jun-2014 1
Installation Instructions
- Mounting
XCITE/BBC
IQ3xcite Battery Option Board
Important: Retain these instructions
These instructions shall be used by trained service personnel only
If the equipment is used in a manner not specified by these instructions, the protection provided by the equipment may be impaired.
1
Switch off
2
Isolate I/O
3
Open Panel
4
Remove Auxiliary Board Cover
3 INSTALLATION
1
BOX CONTENTS
2 STORING
CONTENTS
1
Box contents
..................................................................
1
2 Storing
...........................................................................
1
XCITE/BBC Installation
Instructions (TG200686)
3 Installation
.....................................................................
1
4 Disposal
.........................................................................
2
H O
2
+70 °C
(158 °F)
0
-10 °C
(-14 °F)
95 %RH
WARNING
: The connecting leads may be
connected to supplies. Isolate before touching.
also isolate any
I/O modules
WARNING
:Opening the panel may
expose dangerous voltages.
417-IEC-5036