IQ251 Installation Instructions TG103483 Issue 4, 09-May-2012 1
Installation Instructions
IQ251
Controller
Important: Retain these instructions
These instructions shall be used by trained service personnel only
If the equipment is used in a manner not specified by these instructions, the protection provided by the equipment may be impaired.
1
Dimensions
2
Mounting Requirements
3 InsTallaTIon
3.1 Installation - Mounting
1 UnpaCkIng
2 sToRIng
It is recommended that the installation should comply
with the local electrical safety installation practices (e.g.
HSE Memorandum of Guidance on Electricity at Work
Regulations 1989, USA National Electric Code).
ConTenTs
1
Unpacking .....................................................................
1
2
Storing ...........................................................................
1
3 Installation
.....................................................................
1
3.1
Installation - Mounting ...................................................
1
3.2
Installation - Configuration ............................................
7
4
Mounting in an Enclosure, ENCLS/.............................
12
5
Connecting to PC using Supervisor Port ....................
12
6
Replacing the Battery ..................................................
13
7
Zero Address/Baud Rate Switch Reset ......................
15
8
Replacing the Fuse .....................................................
16
IQ251
Installation Instructions,
TG103483
/230
only
/EIN/, /EAO/,
or /EDO/
(option)
PART/LA102359K
(option)
/24VAC,
/24VDC only
H O
2
+50 °C
(122 °F)
0
-10 °C
(14 °F)
90 %RH
IQ
251
30 mm (2”)
30 mm (2”)
550 mm (21.7”)
175 mm (6.9”)
44
0 m
m (
17
.3
2”
)
a
IQ
251
IQ
251
b
e
IQ
251
IQ
251
The unit must be installed
in an enclosure rated to
IP20 or equivalent.
!
IQ
251
d
0 °C
(32 °F)
+45 °C
(113 °F)
0 %RH
90 %RH
H O
2
c
altitude:
<2000m (6562 ft)