2022 Checkpoint SL/SLR
11
5. Apply grease to the bolt and nut as shown below.
NOTICE:
Do not apply grease to the threads
.
6
1
6. Place the washers on the bolt. Tighten the nut to
8Nm while securing the bolt with a wrench as shown
below.
8Nm
7
.
8
8
.
0
8
.2
6
3
2
1
7. Re-install the IsoSpeed covers.
8. Allow the assembly to cure for 24 hours at room
temperature (72°F/22°C).
IsoSpeed — SL (continued)