Pg. 1
Parrot Island Fort- Base Install
HARDWARE NEEDED
PIH-6- 3/8” x 7” Hex Bolt-
(2)
PIH-21- 3/8” Bolt Cup-
(2)
PIH-16- 3/8” USS Flatwasher-
(4)
PIH-12- 3/8” Split Lockwasher-
(2)
PIH-3- 3/8” Hex Nut-
(2)
PIH-1- 3/8” Acorn Nut Plated-
(4)
PIH-4- 3/8” x 4 1/2” Hex Bolt-
(2)
PIH-15- 1/4” USS Flatwasher-
(10)
PIH-8- 1/4” x 3” Hex Lag Screw-
(10)
PIH-13- 3/8” 4-Prong T-Nut-
(2)
PARTS NEEDED
PFB-32- Trapeze Arm-
(1)
PFB-33- Left Corner Post-
(1)
PFB-34- Right Corner Post-
(1)
PFB-28- Mainbeam-
(1)
PFB-16- 4- Hole Facia-
(2)
PFB-34
PFB-32
PFB-33
PFB-28
PFB-16
PFB-16
PIH-8
PIH-15
PIH-8
PIH-15
PIH-6
PIH-21
PIH-16
PIH-12
PIH-3
PIH-1
PIH-4
PIH-16
PIH-13
PIH-15
PIH-8
PIH-1
The Upper PFB-16 is 52 3/4” From The Ground