background image

IMPORTANT - PLEASE READ

 

 

As fresh lumber acclimates to its new environment, the 

natural tendencies of the tree can show itself in the form of 

checks, or “cracks” in the lumber. In almost all cases this is 

normal and it will not affect the structural integrity of your play 

set.

 

Cosmetic defects that do not affect the structural integrity 

of the product, or natural defects of wood such as warping, 

checking or any other physical properties of wood that do not 

present a safety hazard, are not covered by this warranty.
 

Defects that develop because the product is exposed to 

extreme climate conditions are not covered by this warranty. 

Defects that develop as a result of faulty or improper installation 

of the product are also not covered by this warranty.
 

Most cracks are not warrantable, however if you believe 

that the integrity of your play set is compromised by this natural 

occurrence, please contact the Tree Frogs Swing Set Dealer that 

you purchased your swing set from.

 

We appreciate your purchase and know that you will enjoy 

your play system for many years to come.

Tools Needed for Assembly

Tape Measure   

 

      

24” Level 

 

 

     Angle Square

Phillips Screw Driver   

      

3/8” Cordless Drill or Electric Drill       3/8” Drive Ratchet or Electric Impact Gun 

Claw Hammeror Rubber Mallet 

      

Pliers or Vise Grips 

 

     7/16” Deep Well Socket 

 

9/16” Deep Well Socket       

 

3/4” Deep Well Socket   

     1/8”, 1/4”, and 9/16” Drill Bits 

Phillips Head Screw Bits 

      

An Adult with two Adult Helpers

Please familiarize yourself with the install manual, parts/components and general construction process of your new swing set before 

getting started. Approximate assembly time: 6 to 8 hours. 6 foot unobstructed safety perimeter around swingset recommended.

Summary of Contents for 6.5 JAGUAR PLAYCENTER

Page 1: ......

Page 2: ...arranty Most cracks are not warrantable however if you believe that the integrity of your play set is compromised by this natural occurrence please contact the Tree Frogs Swing Set Dealer that you pur...

Page 3: ...4 and 3 8 lag bolts must have pre drilled holes 1 1 2 to 2 deep Use a 1 8 drill bit for the 1 4 lag bolts and 1 4 drill bit for 3 8 lag bolts Use pre drilled holes in facias as a reference for placin...

Page 4: ...a hard surface can result in serious or fatal injury The U S Consumer Product Safety Commission CPSC recommends that you install and maintain a resilient surface under your swing set The CPSC s Consu...

Page 5: ...slide Not to climb on top of the swing support Not to attach to the swing set any item that is not specifically designed for use with the equipment such as but not limited to jump ropes clotheslines...

Page 6: ...orted critical heights which varied from 10 feet to greater than 12 feet It is recommended that persons seeking to install shredded tires as a protective surface request test data from the supplier sh...

Page 7: ...lars buoy ball blow molded slides and disc seat that are not covered under the 10 Year Warranty to be free from defects in material and workmanship Surface rust fading weathering cracks chips in coati...

Page 8: ...Rockwall Board Slim 1 CC 071 462 2 43 7 8 Rockwall Board w Hole 1 CC 068 462 3 43 7 8 1 Rock Rockwall Board 7 CC 069 462 4 43 7 8 2 Rock Rockwall Board 4 CC 070 462 5 43 7 8 Blank Rockwall Board 4 CC...

Page 9: ...cription QTY CC 100 462 8 25 Rail Bottom 6 CC 099 462 9 25 Rail Top 3 CC 103 462 10 28 Rope Rung 7 CC 104 462 11 30 Deck Runner 4 CC 116 462 12 60 3 4 Center Tarp Board 1 CC 118 462 13 67 1 2 Tarp Boa...

Page 10: ...CC 135 462 15 30 Center Support Deck 2 CC 124 462 16 54 Deck Board 8 CC 240 462 17 7 7 8 Small A Frame Block 1 CC 143 462 18 9 Rope Block 1 CC 244 462 19 13 3 8 A Frame Block w Sinks 1 CC 243 462 20 1...

Page 11: ...ion QTY CC 148 462 22 19 Left Gusset 5 CC 142 462 23 25 Entrapment Block 1 CC 173 462 24 38 7 8 Corner Post 4 CC 174 462 25 70 Ground Runner 1 CC 175 462 26 80 5 8 Center Post 2 CC 176 462 27 100 Uppe...

Page 12: ...tion QTY CC 178 462 29 10 1 16 Lower Rope Runner 1 462 30 119 1 2 Top Joist 1 462 31 119 1 2 Swingbeam Top Joist 1 CC 188 462 32 16 Left Gusset 2 CC 189 462 33 16 Right Gusset 2 462 34 88 1 2 Left Roc...

Page 13: ...6 88 1 2 Left Step Ladder Leg 1 462 37 88 1 2 Center Pipe Step Ladder Leg 1 462 38 88 1 2 Right Pipe Ladder Leg 1 CC 245 462 39 88 A Frame Crossmember 1 462 40 107 Mainbeam 2 CC 184 462 41 132 5 8 Jag...

Page 14: ...tion QTY 456 1 15 3 8 Short Fan Board 4 456 2 19 Wood Roof Support 2 456 3 20 1 4 Center Fan Board 2 456 4 21 Long Fan Board 4 CC 020 456 5 25 Wood Roof Support 4 456 6 69 3 4 Bottom Fan Board 2 CC198...

Page 15: ...456 JPC Wood Roof Description QTY 456 8 67 1 2 Wood Roof Tarp Board 1 456 9 73 3 8 Left WR Runner 2 456 10 73 3 8 Right WR Runner 2 456 11 67 1 2 Wood Roof Board Ripped 2 456 12 67 1 2 Wood Roof Board...

Page 16: ...n QTY 457 1 24 13 16 Panel Support 6 457 2 4 1 2 Upper Panel Board 9 12 457 3 7 13 16 Upper Panel Board 2 4 457 4 10 1 4 Upper Panel Board 12 4 457 5 10 5 16 Upper Panel Board 3 4 457 6 16 3 4 Upper P...

Page 17: ...Upper Panel Board 6 4 457 9 19 13 16 Upper Panel Board 7 4 457 10 42 1 2 Upper Inside Panel Support 4 457 11 23 Upper Panel Board 11 4 457 12 6 15 16 Upper Panel Board 1 4 CC 057 457 13 14 Left Treeho...

Page 18: ...KSI 457 JPC Treehouse Panel Description QTY 457 15 14 1 4 Upper Panel Board 4 4 457 16 23 Upper Panel Board 10 4 457 17 23 1 16 Upper Panel Board 8 4 CC 089 457 18 27 1 2 Lower Panel Filler Board 12...

Page 19: ...OTE YOU MUST ASSEMBLE THIS PRODUCT IN ACCORDANCE WITH THESE ASSEMBLY INSTRUCTIONS WHEN COMPLETE GIVE MANUAL TO OWNER Bag A 1 3 8 x 16 Acorn Nut Plated QTY 4 Bag A 2 1 2 13 Acorn Nut Plated QTY 22 Bag...

Page 20: ...ASSEMBLY INSTRUCTIONS WHEN COMPLETE GIVE MANUAL TO OWNER Bag A 9 M10 x 80 Spring Clip QTY 5 Bag A 10 2 3 QTY 1 Bag B 8 x 2 1 2 Coated Deck Screw QTY 214 Bag C 1 2 13 Hex Nut ZP QTY 22 Bag D 1 4 x3 He...

Page 21: ...JAGUAR PLAYCENTER HARDWARE INSTALLER NOTE YOU MUST ASSEMBLE THIS PRODUCT IN ACCORDANCE WITH THESE ASSEMBLY INSTRUCTIONS WHEN COMPLETE GIVE MANUAL TO OWNER Bag L 3 8 Split Lockwasher ZP QTY 4 Bag M 1 2...

Page 22: ...MATCH HARDWARE SIZES KSI 462 SWINGBEAM HARDWARE INSTALLER NOTE YOU MUST ASSEMBLE THIS PRODUCT IN ACCORDANCE WITH THESE ASSEMBLY INSTRUCTIONS WHEN COMPLETE GIVE MANUAL TO OWNER SBH 1 3 8 16 Acorn Nut P...

Page 23: ...TO MATCH HARDWARE SIZES KSI 462 SWINGBEAM HARDWARE INSTALLER NOTE YOU MUST ASSEMBLE THIS PRODUCT IN ACCORDANCE WITH THESE ASSEMBLY INSTRUCTIONS WHEN COMPLETE GIVE MANUAL TO OWNER SBH 6 3 8 13 Hex Nut...

Page 24: ...CE WITH THESE ASSEMBLY INSTRUCTIONS WHEN COMPLETE GIVE MANUAL TO OWNER SBH 11 3 8 x 3 1 2 Hex Lag Screw ZP QTY 2 SBH 12 3 8 x 5 Hex Lag Screw ZP QTY 2 SBH 13 3 8 16 Nylon Insert Locknut NE ZP QTY 8 SB...

Page 25: ...LY INSTRUCTIONS WHEN COMPLETE GIVE MANUAL TO OWNER Bag A 1 3 8 16 Acorn Nut Plated QTY 4 Bag A 2 3 8 16 x5 Carriage Bolt ZP QTY 4 Bag A 3 8 x 1 1 4 Coated Deck Screw QTY 36 Bag A 4 8 x 1 1 2 Coated De...

Page 26: ...EWS SHOWN ABOVE ARE 1 1 SCALE AND CAN BE USED TO MATCH HARDWARE SIZES 457 TREEHOUSE PANELS HARDWARE INSTALLER NOTE YOU MUST ASSEMBLE THIS PRODUCT IN ACCORDANCE WITH THESE ASSEMBLY INSTRUCTIONS WHEN CO...

Page 27: ...on QTY 462 A 48 Plastisol Coated Chain 3 462 B Tire Swivel 1 462 C Large Rocks 15 462 D 19 Ship s Wheel 1 462 E 80 Chained Belt Swing 2 462 F 20 Trapeze Bar w Rings 60 Chain 1 462 G 1 x 16 Polyester R...

Page 28: ...s 3 462 I 21 x 63 Chain Ladder 1 462 J 1 1 4 Dia x 16 ga x 25 PlayGrip Tube PC Coated 2 462 K 1 1 4 Dai x 16ga x 44 PlayGrip Tube PC Coated 1 462 L Ductile Iron Swing Hanger 6 462 M 1 1 4 x 10 PlayGri...

Page 29: ...Picture Description QTY 462 O Swingbeam T Bracket 1 462 P Swingbeam 45 Degree Bracket 2 462 Q Heavy Duty Tire Eye Bolt 3 462 R Disc Swing 1 462 S Telescope 1...

Page 30: ...NEEDED I 1 4 20 x 1 1 4 Pan Phil M S ZP 26 K 1 4 20 x 7 16 4 Prong Tee Nut ZP 26 N 1 4 Uss Flatwasher ZP 26 PARTS NEEDED CC 068 1 Rock Rockwall Board 7 CC 069 2 Rock Rockwall Board 4 462 C Large Rock...

Page 31: ...crew 68 6 5 Rockwall Assembly PARTS NEEDED CC 071 Rope Hole Rockwall Board 1 462 1 Rockwall Board Slim 1 CC 070 Rockwall Board Blank 4 462 34 Left Rockwall Leg 1 462 35 Right Rockwall Leg 1 B 4 6 2 1...

Page 32: ...3 Wood Step 6 462 37 Center Step Pipe Ladder Leg 1 462 36 Left Step Ladder Leg 1 462 38 Right Pipe Ladder Leg 1 462 I 21 x 63 Chain Ladder 1 462 J 1 1 4 x 25 PlayGrip Tube 2 462 K 1 1 4 x 44 PlayGrip...

Page 33: ...6 5 Combo Ladder Assembly HARDWARE NEEDED J Metal Tap Screw 7 J...

Page 34: ...E NEEDED B 8 x 2 1 2 Coated Deck Screw 72 PARTS NEEDED CC 104 Deck Runner 4 CC 134 Deck Board Slim 4 CC 135 Center Deck Support 2 CC 124 Deck Board 8 Make 2 of these Assembly B CC 134 C C 1 3 4 CC 135...

Page 35: ...2 Uss Flatwasher 2 SBH 20 3 8 Bolt Cup 1 SBH 9 3 8 x 10 Hex Bolt 1 SBH 10 1 2 x 12 Hex Bolt 1 PARTS NEEDED CC 240 Center A Frame Block 1 CC 243 A Frame Block 1 CC 244 A Frame Block Sinked 1 CC 246 A...

Page 36: ...6 x 7 Hex Bolt 8 SBH 13 3 8 Nylon Insert 8 SBH 15 3 8 Split Lockwasher 8 SBH 17 3 8 Uss Flatwasher 8 SBH 20 3 8 Bolt Cup 8 PARTS NEEDED CC 184 Jaguar Universal Swingbeam 1 453 L Ductile Iron Swing Han...

Page 37: ...3 8 Uss Flatwasher 1 SBH 18 1 2 Uss Flatwasher 2 SBH 20 3 8 Bolt Cup 1 SBH 19 3 4 Uss Flatwasher 2 SBH 9 3 8 x 10 Hex Bolt 1 SBH 4 1 2 13 x 7 Carriage Bolt 2 PARTS NEEDED Swingbeam Assemly 1 A Frame L...

Page 38: ...crew 5 O 3 8 Uss Flatwasher 13 PARTS NEEDED Rockwall Assembly 1 Ladder Assembly 1 CC 149 Left Gusset 2 CC 148 Right Gusset 2 CC 174 Ground Runner 1 CC 178 Lower Rope Runner 1 ROCKWALL ASSEMBLY C C 174...

Page 39: ...4 A 2 1 2 Acorn Nut Plated 4 C 1 2 Hex Nut 4 M 1 2 Split Lockwasher 4 P 1 2 Uss Flawasher 4 Q 3 4 Uss Flatwasher 4 PARTS NEEDED Rockwall Assembly 1 Ladder Assembly 1 462 40 Mainbeam 2 A 5 Q P M C A 2...

Page 40: ...6 5 JPC Main Assembly HARDWARE NEEDED F 3 8 x 3 1 2 Hex Lag Screw 16 O 3 8 Uss Flatwasher 16 PARTS NEEDED CC 188 Left Gusset 2 CC 189 Right Gusset 2 CC 189 CC 188 CC 189 CC 188 F O F O...

Page 41: ...PARTS NEEDED Deck Assembly 2 HARDWARE NEEDED E 1 4 x 4 1 2 Hex Lag Screw 8 N Uss Flatwasher 8 6 5 JPC Main Assembly E N Rockwall Side Level Combo Ladder Side Level D e c k A s s e m b l y...

Page 42: ...2 1 2 Acorn Nut Plated 2 C 1 2 Hex Nut 2 M 1 2 Split Lockwasher 2 P 1 2 Uss Flawasher 2 Q 3 4 Uss Flat Washer 2 PARTS NEEDED 453 B Tire Swivel 1 6 5 JPC Main Assembly 453 B A 3 Q P M C A 2 USING A 9...

Page 43: ...DED A 4 1 2 x 6 1 2 Carriage Bolt 6 A 2 1 2 Acorn Nut Plated 6 C 1 2 Hex Nut 6 M 1 2 Split Lockwasher 6 P 1 2 Uss Flawasher 6 Q 3 4 Uss Flat Washer 6 PARTS NEEDED CC 173 Corner Post 4 CC 175 Center Po...

Page 44: ...ED A 4 1 2 x 6 1 2 Carriage Bolt 6 A 2 1 2 Acorn Nut Plated 6 C 1 2 Hex Nut 6 M 1 2 Split Lockwasher 6 P 1 2 Uss Flawasher 6 Q 3 4 Uss Flat Washer 6 PARTS NEEDED 462 30 Top Joist 1 462 31 Top Joist SB...

Page 45: ...4 Q 3 4 Uss Flat Washer 4 G 3 8 x 5 Hex Lag Screw 4 O 3 8 Uss Flatwasher 8 A 1 3 8 Acorn Nut Plated 4 A 6 3 8 16 x 5 Hex Bolt 4 A 7 3 8 Nylon Insert Locknut 4 A 8 3 8 Bolt Cup 4 L 3 8 Split Lockwashe...

Page 46: ...6 5 JPC Main Assembly HARDWARE NEEDED F 3 8 x 3 1 2 Hex Lag Screw 12 O 3 8 Uss Flatwasher 12 PARTS NEEDED CC 149 Left Gusset 3 CC 148 Right Gusset 3 O F F O CC 148 C C 1 4 9 C C 1 4 9 C C 1 4 8...

Page 47: ...Hex Lag Screw 4 O 3 8 Uss Flatwasher 4 D 1 4 x 3 Hex Lag Screw 6 N 1 4 Uss Flatwasher 6 PARTS NEEDED CC 100 Rail Bottom 3 CC 143 Rope Block 1 CC 142 Entrapment Block 1 O G CC 142 N D CC 100 O G CC 143...

Page 48: ...6 5 JPC Main Assembly PARTS NEEDED CC 103 Rope Rung 7 462 G 16 Rope w Rope Caps 1 462 H 18 Rope w Rope Caps 3 462 G 462 H CC 103...

Page 49: ...HARDWARE NEEDED H 14 x 2 Pan Phillip T S 12 N 1 4 Uss Flatwasher 12 PARTS NEEDED 462 M Safety Handle 4 462 N PlayGrip Ladder Handle 3 6 5 JPC Main Assembly H N 462 N 462 M 4 6 2 M 462 M 462 M H N...

Page 50: ...6 5 JPC Main Assembly HARDWARE NEEDED A 9 M10 x 80 Spring Clip 3 PARTS NEEDED Tire 1 462 A 43 Plastisol Coated Chain 3 462 Q Heavy Duty Tire Eye Bolt 3 462 Q 462 A A 9 T i r e 462 A 462 A 462 Q...

Page 51: ...JPC Main Assembly HARDWARE NEEDED A 9 8 x 80mm Spring Clip 2 H 14 x 2 Pan Phillip T S 3 N 1 4 Uss Flatwasher 3 PARTS NEEDED Slide 1 462 E 20 Trapeze Bar W Ring 43 Chain 1 H N 4 6 2 E A 9 Slide Base Sl...

Page 52: ...Carriage Bolt 2 SBH 7 1 2 Hex Nut 2 SBH 16 1 2 Split Lockwasher 2 SBH 18 1 2 Uss Flatwasher 2 SBH 19 3 4 Uss Flat washer 2 PARTS NEEDED 462 D 19 Ship s Wheel 1 462 O Swingbeam T Bracket 1 462 S Teles...

Page 53: ...age Bolt 1 SBH 5 1 2 x 9 Carriage Bolt 1 SBH 7 1 2 Hex Nut 2 SBH 16 1 2 Split Lockwasher 2 SBH 18 1 2 Uss Flatwasher 2 SBH 19 3 4 Uss Flat washer 2 PARTS NEEDED Swingbeam Assembly 1 6 5 JPC Main Assem...

Page 54: ...Carriage Bolt 2 SBH 7 1 2 Hex Nut 2 SBH 16 1 2 Split Lockwasher 2 SBH 18 1 2 Uss Flatwasher 2 SBH 19 3 4 Uss Flat washer 2 PARTS NEEDED CC 182 A Frame Crossmember 1 USING A 9 16 DRILL BIT AT MARKED H...

Page 55: ...BH 21 8 x 80mm Spring Clip 4 SBH 12 3 8 x5 Hex Lag Screw 2 SBH 17 3 8 USS Flat Washer 2 PARTS NEEDED 462 F 80 Chained Belt Swing 2 462 G 14 Polyester Rope w Rope Caps 1 462 R Disc Swing 1 4 6 2 F 4 6...

Page 56: ...ED CC 116 Center Tarp Board 1 CC 118 Tarp Board 2 Tarp 1 E N Tarp R MARK THE PLACEMENT OF THE TARP SNAPS CC 118 CC 116 C C 1 1 8 HARDWARE NEEDED E 1 4 x 4 1 2 Hex Lag Screw 6 N 1 4 Uss Flatwasher 6 R...

Page 57: ...Tarp Option...

Page 58: ...4 A 8 3 8 Split Lockwasher 4 A 10 3 8 Uss Flatwasher 4 A 11 1 2 Uss Flatwasher 4 A 7 1 4 x 4 1 2 Hex Lag Screw 6 A 9 1 4 Uss Flatwasher 6 PARTS NEEDED 456 8 Wood Roof Tarp Board 1 456 9 Left WR Runne...

Page 59: ...Coated Deck Screw 36 A 4 1 1 2 Coated Deck Screw 136 PARTS NEEDED 456 2 Wood Roof Support 2 CC 020 Wood Roof Support 4 456 11 Wood Roof Board Ripped 2 456 12 Wood Roof Board 32 456 12 A 3 A 4 CC 020 4...

Page 60: ...ew 136 A 6 1 4 x 1 1 2 Hex Lag Screw 14 A 9 1 4 Uss Flatwasher 14 PARTS NEEDED 456 1 Short Fan Board 4 456 3 Center Fan Board 2 456 4 Long Fan Board 4 456 6 Bottom Fan Board 2 456 7 Center Fan Board 2...

Page 61: ...WOOD ROOF...

Page 62: ...Open Rail HARDWARE NEEDED B 2 1 2 Coated Deck Screw 60 PARTS NEEDED CC 088 Rail Spindle 15 CC 100 Rail Bottom 6 CC 099 Rail Top 6 MAKE 3 OF THESE CC 088 B C C 1 0 0 CC 099...

Page 63: ...Open Rail Install HARDWARE NEEDED D 1 4 x3 Hex Lag Screw 6 E 1 4 x 4 1 2 Hex Lag Screw 6 N 1 4 Uss Flatwasher 12 PARTS NEEDED Rail Assembly 3 N E D N R a i l s A s s e m b l y...

Page 64: ...Deck Screw 108 PARTS NEEDED CC 088 Rail Spindle 15 CC 100 Rail Bottom 3 CC 099 Rail Top 3 457 1 Panel Support 6 CC 089 Lower Panel Filler Board 12 451 6 451 7 MAKE 3 OF THESE C C 0 8 9 C C 0 8 9 C C...

Page 65: ...Closed Panel Install HARDWARE NEEDED D 1 4 x 3 Hex Lag Screw 6 E 1 4 x 4 1 2 Hex Lag Screw 6 N 1 4 Uss Flatwasher 12 PARTS NEEDED Solid Rail Assembly 3 S o l i d R a i l A s s e m b l y N E D N...

Page 66: ...ED 457 2 Upper Panel 9 12 457 7 Window Arch 4 457 11 Upper Panel Board 11 4 CC 057 Left Treehouse Shutter 4 CC 058 Right Treehouse Shutter 4 457 16 Upper Panel Board 10 4 457 17 Upper Panel Board 8 4...

Page 67: ...Panel Board 3 4 457 6 Upper Panel Board 5 4 457 8 Upper Panel Board 6 4 457 9 Upper Panel Board 7 4 457 10 Upper Inside Panel Support 4 457 12 Upper Panel Board 1 4 457 15 Upper Panel Board 4 4 457 1...

Page 68: ...Treehouse Panel...

Page 69: ......

Reviews: