IP39-60ePCR
Quick Guide Manual
3
IP39-60ePCR Installation:
First, use hand drill to make 4 screw
holes for Terminal Block.
Put 4 terminal blocks into the holes.
Step 1
Step 2
Put Surface Mount Box onto the wall
and use 4 Surface Mount Box Screws
to fix it on the wall.
Put Back Covers of IP39-60e onto
Surface Mount Box and fix it with
4 Back Cover Screws.
Step 3
Put IP39-60e on the Back Cover.
There are 4 hooks on back cover, must
make sure IP39-60e be hook on.
(These hooks have anti-vandal function)
Put Rain Hood Piece on the top of
Surface Mount Box and fix it with
4 Rain Hood Screws on both sides.
After fixing the Rain Hood, the installation
is complete.
IP39-60e
IP39-60e