Transtector I2R SuperHy 120 Installation Instructions Download Page 2

Installation Instructions

800.882.9110  |  208.772.8515  |  www.Transtector.com

Figure 1 - Mechanical Outline Drawing (mm)

Figure 4 - Remote Contact Connections

Figure 3 - Wiring Diagram

Figure 2 - Installation

I²R SuperHy 120

INSTALLATION NOTES

The I²R SuperHy 120 is used to protect power supplies from over-voltage 

caused by transients.  This Surge Protection Device (SPD) offers hybrid 

bidirectional silicon avalanche diode and metal oxide varistor suppression 

technology and is intended for installation on the load side of the service 

equipment over current device.  The SPD is installed in parallel with the 

load.  If the lightning protection zone concept is used, this SPD installs 

at the boundary of LPZ1 and LPZ2.  The SPD features visual status 

indication.  The normally black indicator turns red if the module needs 

replacement.  Electrically isolated Form C dry contacts provide remote 

monitoring capability.  The SPD is designed to be installed in a restricted 

access enclosure.

INSTALLATION INSTRUCTIONS

1. Mounting:  Position the SPD as close to the equipment being protected 

as possible in order to minimize the conductor length.  The SPD should 

be attached to a securely mounted 35mm DIN rail.  The SPD shall be 

mounted by positioning the terminal block end on the top edge of the DIN 

rail and pressing downward until a ‘click’ is heard (see Figure 2).

2. Wiring:  The SPD shall be installed in parallel with the load or electrical 

system wiring using #6 - #14 AWG wire.  The maximum torque to be 

applied to the terminal screws is 1.6 Nm (15 lb-in).  Interconnecting wire 

should be no longer than 500mm (20”) in total length with a maximum bend 

radius of 100mm (4”).  Strip the wire insulation 8mm (5/16”).  Do not loop 

or twist the interconnecting wire.  Determine the electrical configuration 

and wire as shown in Figure 3.

3. Remote Annunciation:  Electrically isolated Form C dry contacts provide 

remote monitoring capability.  The removable plug accepts #16 - #30 

AWG  wire.    The  continuous  current  rating  for  the  remote  indicator  is                     

3A @ 125 VAC maximum.  Strip the wire 6mm (1/4”), and torque the 

terminal screw 0.2 Nm (1.8 lb-in).  The terminal is labeled with Normally 

Open (NO), Normally Closed (NC) and Common (COM).  Install signal 

wiring as shown in Figure 4.

USAGE AND MAINTENANCE

The SPD should be scheduled for periodic inspection to ensure the SPD is 

operational and all wire connections are tight.

If the SPD is damaged, contact Transtector for replacement.