
actuation of this switch.
A strapping cycle is completed only after
This is the switch to start a strapping operation
1 Start switch
3 F/R switch
(Feed and Reverse)
After P.P. strap is fed and the main power switch is
on, turn this switch counterclockwise to feed P.P.
the arch track to the accumulator box.
clockwise, P.P. strap reverses and returns strap from
strap around arch. When the switch is turned
4 Power pilot lamp
When the main power switch is turned on, the pilot
lamp lights up, showing that electric power is being
supplied. If the machine has the short feed sensor,
has reset function and lights up if under power.
5 Auto/Hand selector switch
While selector switch is placed to the position ,
the machine will automatically strap the package
to the position , after positioning the package under
remains under the arch. ) While the selector switch is placed
( the strapping cycle will continue, if the package
be applied.
the arch, push the "START" switch, then one strap will
When strap no at home position sealing this switch
-6-
b. (For CE Version)
01/18/08
Summary of Contents for 3-GPTP-6000
Page 7: ...09 10 08...
Page 10: ...09 10 08...
Page 19: ...01 18 08...
Page 23: ...20 d TP 6000 3 TP 6000 3S PAGE 1 A B 2 3 MACHINE MODEL C D E 4 A B C D E F 1 2 3 4 F 01 18 08...
Page 25: ...01 18 08...
Page 30: ...CAM GROUP 2 1 1 T6 1 10006 T6 1 10007 01 18 08...
Page 32: ...09 10 08...
Page 33: ...SLIDE TABLE GROUP 5 1 2 T6 1 20005 01 18 08...
Page 38: ...PRESS GROUP 9 1 3 T6 1 30000 01 18 08...
Page 43: ...11 27 08...
Page 45: ...16 01 18 08...
Page 47: ...STRAPPING HEAD GROUP 18 1 5 T6 1 50000 01 18 08...
Page 49: ...TENSION GROUP 20 1 6 T6 1 60000 01 18 08...
Page 58: ...FEED ASS Y 28 1 7 1 T6 1 71000 01 18 08...
Page 61: ...11 27 08...
Page 63: ...BANDWAY GROUP 32 2 1 T6 2 10000 40 01 18 08...
Page 71: ...ARCH ASS Y 36 2 2 1 T6 2 21000 01 18 08...
Page 78: ...ACCUMULATOR GROUP 39 3 1 T6 3 10000 01 18 08...
Page 81: ...ACCUMULATOR ASS Y 41 3 1 1 T6 3 11000 01 18 08...
Page 83: ...ACCUMULATOR BOX GROUP 43 3 2 T6 3 20000 01 18 08...
Page 89: ...REEL CONTROL GROUP 48 4 2 T6 4 20000 T6 4 20000S 01 18 08...
Page 95: ...BODY FRAME GROUP 53 5 1 T6 5 10014 01 18 08...
Page 110: ...11 27 08...
Page 116: ...TP 6000 1 TP 6000CE1 ELECTRIC CONTROL GROUP 66 6 2 T6 6 30024 T6 6 40027 01 18 08...
Page 119: ...09 10 08...