Transition Networks
SM24DPB Install Guide
33681 Rev. B
https://www.transition.com
Page
11
of
24
Power
Supply
Sockets
:
There
are
dual
power
inputs
on
the
front
panel
of
the
switch
for
power
redundancy
requirement,
the
SM24DPB
switch
has
100~240
VAC
power
socket
for
AC
power
Input
and
‐
36VDC
~
‐
48VDC
power
input
via
terminal
block.
Installation
Unpacking
Verify
that
you
have
received
the
packing
items.
□
One
SM24DPB
GbE
Fiber
Managed
Switch
□
Four
adhesive
rubber
feet
□
Mounting
Accessory
(for
19
”
Rack
Shelf)
□
One
printed
Quick
Start
Guide
□
AC
Power
Cord
□
RS232
DB9
to
DB9
Cable
An
optional
DC
Power
Supply
may
be
included.
Contact
your
sales
representative
if
any
items
are
missing
or
damaged.
Save
the
packaging
for
possible
future
use.
Selecting a Site
The
Switch
can
be
mounted
in
a
standard
19
‐
inch
equipment
rack
(via
Rack
mount
Ki
t
).
Be
sure
to
follow
the
guidelines
below
when
choosing
a
location.
◆
The
site
should:
Be
at
the
center
of
all
the
devices
you
want
to
link
and
near
a
power
outlet.
Be
able
to
maintain
its
temperature
within
‐
20
to
60°C
and
its
humidity
within
5%
to
95%,
non
‐
condensing.
Be
accessible
for
installing,
cabling
and
maintaining
the
devices.
Allow
the
status
LEDs
to
be
clearly
visible.
◆
Make
sure
the
twisted
‐
pair
Ethernet
cable
is
always
routed
away
from
power
lines,
radios,
transmitters
or
any
other
electrical
interference.
Make
sure
that
SM24DPB
Series
Switch
is
connected
to
a
separate
grounded
power
outlet.