background image

Transition

 

Networks

                                                                                     

SISTG1040

2x2

LRT

 

Install

 

Guide

 

33735

 

Rev.

 

B

 

https://www.transition.com

   

Page

 

13

 

of

 

31

 

LED

 

Descriptions

 

The

 

front

 

panel

 

LEDs

 

let

 

you

 

check

 

and

 

monitor

 

switch

 

status.

 

The

 

three

 

types

 

of

 

front

 

panel

 

LEDs

 

are:

 

 

Power

 

LEDs

 

(P1,

 

P2)

 

indicate

 

if

 

the

 

switch

 

is

 

powered

 

up

 

correctly.

 

 

System

 

LED

 

indicates

 

if

 

the

 

system

 

is

 

ready.

 

 

Port

 

Status

 

LEDs

 

indicates

 

the

 

current

 

status

 

of

 

each

 

port.

 

Check

 

these

 

LEDs

 

to

 

understand

 

the

 

port

 

status.

 

The

 

following

 

tables

 

describe

 

the

 

LED

 

indicator

 

functions.

 

Power LEDs 

LED

 

Color

 

State

 

Description

 

P1

 

Power1

 

Green

 

On

 

The

 

switch

 

is

 

powered

 

ON

 

correctly.

 

Off

 

The

 

switch

 

is

 

not

 

receiving

 

power

 

from

 

the

 

first

 

power

 

source.

 

P2

 

Power2

 

Green

 

On

 

The

 

switch

 

is

 

powered

 

on

 

correctly.

 

Off

 

The

 

switch

 

is

 

not

 

receiving

 

power

 

from

 

the

 

second

 

power

 

source.

 

 

System LED 

LED

 

Color

 

State

 

Description

 

SYS

 

System

 

Green

 

On

 

The

 

switch

 

is

 

ready.

   

Off

 

The

 

switch

 

is

 

not

 

ready.

 

 

Summary of Contents for SISTG1040-242-LRT

Page 1: ...tworks SISTG1040 2x2 LRT Install Guide 33735 Rev B https www transition com Page 1 of 31 SISTG1040 242 LRT and 282 LRT Industrial Unmanaged GbE Switches SISTG1040 242 LRT SISTG1040 282 LRT Install Guide 33735 Rev B ...

Page 2: ...means graphic electronic or mechanical without written permission from Transition Networks Printed in the U S A SISTG1040 242 LRT and 282 LRT Industrial Unmanaged GbE Switches Install Guide33735 Rev B Contact Information Transition Networks 10900 Red Circle Drive Minnetonka MN 55343 USA tel 1 952 941 7600 toll free 1 800 526 9267 fax 952 941 2322 sales transition com techsupport transition com cus...

Page 3: ...rical shock even death WARNING Equipment grounding is vital to ensure safe operation The installer must ensure that the power module is properly grounded during and after installation Failure to observe this warning could result in an electric shock even death WARNING A readily accessible suitable National Electrical Code NEC or local electrical code approved disconnect device and branch circuit p...

Page 4: ...and Frequency 7 Certifications and Compliance 8 Applications 9 About This Manual 9 Related Manuals 9 2 Switch Overview 10 Package Contents 10 Unpacking 10 Front Panels 11 Back Panel and Bottom Panel 12 RESET Button 12 LED Descriptions 13 Power LEDs 13 System LED 13 3 Installation 15 Mounting the Switch on a DIN Rail 15 Mounting the Switch on Wall Optional 16 Grounding Screw 17 Installing SFP Modul...

Page 5: ...g to DC Power 19 Power Connection Procedure 20 4 Troubleshooting 21 Basic Troubleshooting 21 LED Troubleshooting 21 Device Label and Packaging Label 22 Record Device and System Information 23 5 Regulatory and Safety Information 24 Compliance and Safety Statements 24 Declaration of Conformity 24 Certificate of Compliance 25 User Information 26 Cautions and Warnings 27 Electrical Safety Warnings 28 ...

Page 6: ...tch with 4 10 100 1000Base T ports and two 100 1000 dual speed SFP slots Has redundant input power connections for safe reliable operation in temperatures of 40 C 75 C Includes DIN Rail Kit SISTG1040 282 LRT Unmanaged full Gigabit Ethernet hardened switch with 8 10 100 1000Base T ports and two 100 1000 dual speed SFP slots Includes DIN Rail Kit Options sold separately 25135 Optional Industrial Pow...

Page 7: ...emperature Storage Temperature Operating Humidity Altitude Fahrenheit Centigrade Fahrenheit Centigrade 5 to 95 non condensing Feet Meters 40 to 167 40 to 75 40 to 185 40 to 85 10000 3000 Dimensions Weights Mounting Model Dimensions WxHxD Weight Mounting Type Millimeters Inches Kilograms Pounds SISTG1040 242 LRT 44x 135x 130 1 7x 5 3x 5 1 0 36 0 79 DIN rail Wall SISTG1040 282 LRT 44x 135x 130 1 7x ...

Page 8: ...998 Class A IEC 61000 3 3 Ed2 2008 Electromagnetic Compatibility Limitation of voltage fluctuation and flicker in low voltage supply systems for equipment rated up to 16A Class C Safety CE Standards IEEE 802 3 IEEE 802 3u IEEE 802 3z IEEE802 3ae IEEE 802 3x IEEE 802 1p IEEE 802 3az Protocols CSMA CD Compliance UL Class 1 Div 2 EMI CE FCC Part 15 Compliant EN50121 4 EN50155 NEMA TS 2 IEC61850 3 IEE...

Page 9: ...sh environments such as those found on factory floors outdoor enclosures or other hazardous environments About This Manual This manual describes how to install and troubleshoot the SISTG1040 2x2 LRT switch including how to Install the switch Check the switch status LED behavior Reset the switch or restore the switch to factory defaults Troubleshoot switch installation Related Manuals A printed Qui...

Page 10: ...Contact your sales representative if any item is missing Please save the packaging for possible future use The Switch Terminal Block Quick Start Guide Mounting kit Industrial Power Supply Optional Accessory sold separately Unpacking Unpack and verify the contents in their install location and continue with one of the mounting procedures Desktop DIN Rail or Wall mounting in chapter 3 ...

Page 11: ...Transition Networks SISTG1040 2x2 LRT Install Guide 33735 Rev B https www transition com Page 11 of 31 Front Panels SISTG1040 242 LRT Front Panel SISTG1040 282 LRT Front Panel ...

Page 12: ...2x2 LRT Install Guide 33735 Rev B https www transition com Page 12 of 31 Back Panel and Bottom Panel Back Panel Bottom Panel RESET Button Press the RESET button to reboot the switch The front panel LEDs flash and the switch is reset ...

Page 13: ...s LEDs indicates the current status of each port Check these LEDs to understand the port status The following tables describe the LED indicator functions Power LEDs LED Color State Description P1 Power1 Green On The switch is powered ON correctly Off The switch is not receiving power from the first power source P2 Power2 Green On The switch is powered on correctly Off The switch is not receiving p...

Page 14: ...port is transmitting receiving packets and the connection speed is 10 100Mbps Off The port has no active network cable connected or it has not established a link to a connected device SFP Ports Green On The port is enabled and has established a link to a connected device and the connection speed is 1000Mbps Green Blinking The port is transmitting receiving packets and the connection speed is 1000M...

Page 15: ...h on a DIN Rail 1 Attach the DIN Rail mounting kit to rear panel of the chassis Insert screws and tighten with a screwdriver to secure the kit 2 Insert the upper lip of the DIN rail into the DIN rail mounting kit Press the switch towards the DIN rail until it snaps into place 3 Make sure that the switch is attached securely to DIN Rail ...

Page 16: ... Optional Use the Optional Wall Mountable brackets WMBH 01 option 1 Attach the wall mounting plates to rear panel of the chassis Insert screws and tighten then with a screwdriver to secure the plates 2 Install user supplied screws on the appropriate location on the wall 3 Make sure that the switch is attached securely to the wall ...

Page 17: ...om Page 17 of 31 Grounding Screw The front panel grounding screw is used for grounding Grounding and wire routing help limit the effects of noise due to electromagnetic interference EMI Run the ground connection from the ground screws to the grounding surface prior to connecting devices ...

Page 18: ...t the module seats into the connector 4 Insert the fiber cable into the transceiver Connecting to Network Devices The switches provide eight or four 10M 100M 1G RJ45 ports Use Cat 5e or better unshielded twisted pair UTP cable terminated with an RJ 45 connector Use four twisted pair Category 5e or above cabling for RJ 45 port connection The cable between the switch and the link partner switch hub ...

Page 19: ...wer The SISTG1040 2x2 LRT ships with no Power Cord The SISTG1040 2x2 LRT can be ordered with optional accessories sold separately including Industrial Power Supply PN 25130 or 25135 This section is for reference only as site requirements can vary greatly For example the switch can be powered from a DIN rail or it can be powered with a PDU Power Distribution Unit Typically a PDU would deliver 48 vo...

Page 20: ...erminal block and the V and V terminals on the power supply Optionally connect the wires between the P2 and P2 terminals on the switch terminal block and the V and V terminals on the power supply if redundant power is to be used 2 Use a small Phillips screwdriver to tighten the wire clamp screws Power Supply DC to Switch and AC to Wall Outlet 3 Connect the three wires e g green black white of the ...

Page 21: ... Power A on Switch is Ready Blinks when POST is running P1 Power 1 Green First input power supply providing power P2 Power 2 Green Second input power supply providing power Link Act Speed Green Amber Light off port disconnected or link failed Green Light on 1G Link Present No Activity Amber Light on 100M 10M Link Present No Activity Green Blinking 1G Activity Port is sending or receiving data Ambe...

Page 22: ...h 3 If the LED is still off plug power cord into different DC outlet socket to make sure correct DC source is supplied Port Left Side Status LED is Off The port is not connected or the connection is not working 1 Check if the cable connector plug is firmly inserted and locked into the port at both the switch and the connected device 2 Make sure the connected device is up and running correctly 3 If...

Page 23: ...___________________________________________________________________________________________________________ ________________________________________________________________________________________________________________________ ________________________________________________________________________________________________________________________ The serial and revision numbers of all involved Tr...

Page 24: ...not installed and used in accordance with the instruction manual may cause harmful interference to radio communications Operation of this equipment in a residential area is likely to cause harmful interference in which case the user will be required to correct the interference at his own expense You are cautioned that changes or modifications not expressly approved by the party responsible for com...

Page 25: ...Transition Networks SISTG1040 2x2 LRT Install Guide 33735 Rev B https www transition com Page 25 of 31 Certificate of Compliance ...

Page 26: ...use in Class I Division 2 Groups A B C and D or non hazardous locations only WARNING EXPLOSION HAZARD DO NOT DISCONNECT WHILE THE CIRCUIT IS LIVE OR UNLESS THE AREA IS FREE OF IGNITIBLE CONCENTRATIONS Avertissement et mise en garde Installation et fonctionnement corrects français Ces périphériques sont des périphériques de type ouvert qui doivent être installés dans un enceinte uniquement accessib...

Page 27: ...th WARNING The power module has a provision for grounding Equipment grounding is vital to ensure safe operation The installer must ensure that the power module is properly grounded during and after installation Failure to observe this warning could result in an electric shock even death WARNING A readily accessible suitable National Electrical Code NEC or local electrical code approved disconnect ...

Page 28: ...rschriften worden geïnstalleerd Sécurité électrique IMPORTANT Cet équipement doit être utilisé conformément aux instructions de sécurité Sähköturvallisuus TÄRKEÄÄ Tämä laite on asennettava turvaohjeiden mukaisesti Sicurezza elettrica IMPORTANTE questa apparecchiatura deve essere installata rispettando le norme di sicurezza Elektrisk sikkerhet VIKTIG Dette utstyret skal installeres i samsvar med si...

Page 29: ...ents Transition Networks will at its option Repair the defective product to functional specification at no charge Replace the product with an equivalent functional product Refund a portion of purchase price based on a depreciated value To return a defective product for warranty coverage contact Transition Networks Customer Support for a return authorization number Send the defective product postag...

Page 30: ...ansition Networks reserves the right to charge a 50 fee for all testing and shipping incurred if after testing a return is classified as No Problem Found THIS WARRANTY IS YOUR ONLY REMEDY NO OTHER WARRANTIES SUCH AS FITNESS FOR A PARTICULAR PURPOSE ARE EXPRESSED OR IMPLIED TRANSITION NETWORKS IS NOT LIABLE FOR ANY SPECIAL INDIRECT INCIDENTAL OR CONSEQUENTIAL DAMAGES OR LOSSES INCLUDING LOSS OF DAT...

Page 31: ...33735 Rev B https www transition com Page 31 of 31 Transition Networks 10900 Red Circle Drive Minnetonka MN 55343 USA tel 1 952 941 7600 toll free 1 800 526 9267 fax 952 941 2322 Copyright 2018 Transition Networks All rights reserved Printed in the U S A ...

Reviews: