background image

Transition

 

Networks

 

 

SESPM1040

541

LT

xx

 

Quick

 

Start

 

Guide

 

33783

 

Rev.

 

A

 

       

https://www.transition.com

  

Page

 

2

 

of

 

2

 

NFC

 

Pre

Configuration

:

  

You

 

can

 

configure

 

the

 

switch

 

directly

 

in

 

the

 

box

 

and

 

unpack

 

the

 

box

 

contents

 

later

 

at

 

the

 

install

 

location.

 

1.

 

Open

 

the

 

packing

 

box.

 

2.

 

Configure

 

each

 

switch

 

using

 

the

 

Mobile

 

App

 

on

 

an

 

NFC

enabled

 

smart

 

device.

 

3.

 

Select

 

the

 

saved

 

configuration.

  

4.

 

Move

 

the

 

device

 

closely

 

over

 

the

 

NFC

 

target

 

on

 

the

 

front

 

cover

 

of

 

the

 

switch.

 

5.

 

Hit

 

Tap

 

and

 

Go.

 

Basic

 

Installation

 

Steps

 

1.

 

Pre

configure

 

switch(es)

 

using

 

NFC,

 

BLE,

 

CLI

 

or

 

GUI.

 

See

 

the

 

Install

 

Guide.

 

2.

 

Attach

 

switch

 

to

 

pole

 

or

 

wall.

 

If

 

pole

 

mounting,

 

see

 

the

 

SESPM

4P

PMB

 

Kit

 

Option

 

Install

 

Guide.

 

3.

 

For

 

–DC

 

and

 

–PD

 

versions,

 

attach

 

ground

 

wire.

 

See

 

the

 

Install

 

Guide.

 

If

 

using

 

any

 

optional

 

modules,

 

install

 

them

 

now.

 

See

 

the

 

related

 

option

 

install

 

guide.

 

4.

 

Connect

 

data

 

to

 

switch:

 

a)

 

Run

 

Ethernet

 

cable

 

thru

 

cable

 

glands

 

and

 

insert

 

into

 

port

 

5,

 

or

 

b)

 

run

 

fiber

 

cable(s)

 

thru

 

wire

 

glands

 

and

 

route

 

via

 

optional

 

fiber

 

management;

 

insert

 

SFP

 

into

 

SFP

 

cage

 

and

 

connect

 

fiber

 

to

 

SFP.

  

5.

 

Connect

 

Powered

 

Devices

 

to

 

switch;

 

run

 

Ethernet

 

cable

 

from

 

switch

 

PSE

 

ports

 

1

4

 

to

 

devices

 

to

 

be

 

connected

 

and

 

powered.

  

Note

 

if

 

connecting

 

multiple

 

90W

 

devices,

 

we

 

recommend

 

those

 

devices

 

be

 

connected

 

to

 

ports

 

separated

 

from

 

each

 

other

 

(e.g.,

 

ports

 

1

 

and

 

3,

 

or

 

ports

 

1

 

and

 

4,

 

or

 

ports

 

2

 

and

 

4,

 

or

 

ports

 

2

 

and

 

3).

 

6.

 

Connect

 

power

 

to

 

the

 

switch;

 

the

 

three

 

models

 

are

 

powered

 

differently:

  

AC

:

 

Power

 

to

 

the

 

AC

 

is

 

via

 

a

 

built

in

 

12

foot

 

16

 

AWG

 

power

 

cable

 

with

 

a

 

3

prong

 

plug.

 

AC

 

input

 

can

 

be

 

hardwired

 

into

 

AC

 

mains

 

via

 

customer

 

supplied

 

conduit

 

/connectors.

 

Plug

 

into

 

approved

 

AC

 

outlet

 

using

 

supplied

 

AC

 

power

 

cord.

 

If

 

hard

 

wiring,

 

cut

 

off

 

power

 

connector

 

and

 

connect

 

to

 

junction

 

box

 

(if

 

allowed);

 

run

 

cable

 

thru

 

conduit

 

and

 

hard

 

wire

 

to

 

junction

 

box

 

(if

 

code

 

requires).

  

DC

:

 

Power

 

to

 

the

 ‐

DC

 

is

 

via

 

a

 

built

in

 

500W

 

57VDC

 

Open

 

frame

 

Power

 

Supply

 

with

 

a

 

Wire

 

Gland

 

Feed

 

Cable

 

thru

 

a

 

Rubber

 

Boot.

 

Route

 

the

 

DC

 

power

 

cable

 

thru

 

the

 

designated

 

Power

 

Wire

 

gland.

 

Connect

 

the

 

green

 

ground

 

wire

 

to

 

the

 

Ground

 

Post

 

in

 

upper

 

right

 

corner

 

of

 

enclosure.

 

Connect

 

DC

 

wires

 

to

 

DC

 

Power

 

Terminal

 

Block

 

in

 

upper

 

left

 

corner

 

of

 

enclosure.

 

The

 

switch

 

is

 

reverse

 

polarity

 

protected.

 

Local

 

earth

 

ground

 

must

 

be

 

provided.

 

Do

 

not

 

add

 

any

 

large

 

(>100

 

µH)

 

common

 

mode

 

chokes;

 

they

 

may

 

interfere

 

with

 

the

 

inrush

 

current

 

limiting

 

function

 

of

 

the

 

switch.

 

PD

:

 

Power

 

to

 

the

 ‐

PD

 

is

 

via

 

an

 

external

 

PSE

 

able

 

to

 

classify

 

with

 

IEEE

 

802.3bt

 

Type

 

4

 

Class

 

8

 

devices.

 

If

 

powering

 

via

 

PoE,

 

connect

 

an

 

Ethernet

 

cable

 

from

 

the

 

PSE

 

to

 

the

 

PD

 

Port.

 

If

 

powering

 

over

 

copper

 

cable

 

with

 

parallel

 

fiber

 

optic

 

cable,

 

splice

 

DC

 

cable

 

to

 

Ethernet

 

cable

 

stub,

 

plug

 

stub

 

into

 

a

 

PSE

 

port

 

on

 

–AC

 

or

 

–DC

 

switch,

 

then

 

connect

 

wires

 

to

 

screw

 

terminals

 

on

 

the

 

hybrid

 

connector

 

(polarity

 

agnostic)

 

on

 

the

 ‐

PD.

 

Local

 

earth

 

ground

 

must

 

be

 

provided.

   

The

 

Auxiliary

 

12V

 

power

 

port

 

has

 

a

 

2

position

 

bare

 

wire

 

terminal

 

block

 

with

 

screw

 

retention

 

up

 

to

 

12AWG

 

wire

 

size.

  

Attach

 

PoE

 

cable

 

from

 

power

 

source

 

thru

 

cable

 

gland

 

and

 

insert

 

into

 

port

 

5

 

or

 

if

 

using

 

parallel

 

fiber

 

and

 

power

 

cable,

 

run

 

low

 

voltage

 

DC

 

power

 

cable

 

thru

 

cable

 

gland

 

and

 

connect

 

to

 

terminal

 

block

 

on

 

switch.

 

7.

 

Close

 

switch

 

door

 

and

 

lock

 

enclosure

 

using

 

hex

 

driver

 

or

 

tool.

 

When

 

successful,

 

configure

 

ports,

 

power,

 

etc.

   

Hybrid

 

Fiber

:

 

If

 

using

 

parallel

 

fiber

 

and

 

copper

 

power

 

cable,

 

grounding

 

is

 

the

 

same

 

as

 

for

 

the

  ‐

DC

 

version;

 

ground

 

post

 

to

 

be

 

tied

 

to

 

earth

 

ground

 

close

 

to

 

the

 

switch.

  

For

 

terminating

 

the

 

power

 

cable,

 

use

 

the

 

screw

 

terminal

 

block

 

on

 

the

 

DC

 

input

 

module

 

or

 

the

 

PD

 

Aux

 

board

 

in

 

the

 

switch.

  

Boot

 

Process

:

 

After

 

power

 

up

 

the

 

switch

 

takes

 

about

 

1

1/2

 

minutes

 

to

 

boot;

 

the

 

LEDs

 

light

 

after

 

about

 

1

1/2

 

minutes.

 

LED

 

Indicators

:

 

LEDs

 

can

 

be

 

read

 

when

 

the

 

switch

 

door

 

is

 

open:

 

PoE

 

activity,

 

link

 

activity,

 

system

 

readiness,

 

switch

 

power

 

and

 

BLE

 

pairing

 

information

 

are

 

shown

 

and

 

described

 

in

 

the

 

Install

 

Guide.

 

This

 

info

 

can

 

also

 

be

 

accessed

 

via

 

the

 

web

 

UI,

 

Console

 

port,

 

or

 

Web

 

app

 

when

 

the

 

switch

 

door

 

is

 

closed.

 

Troubleshooting

:

 

The

 

BLE

 

app,

 

Console

 

Port,

 

or

 

Web

 

UI

 

can

 

be

 

used

 

to

 

troubleshoot

 

the

 

switch.

 

Contact

 

Us

:

 

Tech

 

Support

:

 

24

hours:

 

US

 

&

 

Canada:

 

1

800

260

1312;

 

Int’l:

 

00

1

952

941

7600.

  

Main

 

Office:

 

tel:

 

+1.952.941.7600

 

|

 

toll

 

free:

 

1.800.526.9267

 

|

 

fax:

 

952.941.2322.

 

[email protected]

  

|

  

[email protected]

  

|

  

[email protected]

  

Web

:

 

https://www.transition.com

 

Reviews: