![Trane XL19i-APG02-EN Application Manual Download Page 16](http://html1.mh-extra.com/html/trane/xl19i-apg02-en/xl19i-apg02-en_application-manual_1149128016.webp)
e
l
b
a
T
w
o
l
f
r
i
A
t
i
n
U
r
o
o
d
t
u
O
i
9
1
L
X
s
t
i
n
U
g
n
i
l
o
o
C
s
t
i
n
U
p
m
u
P
t
a
e
H
r
e
b
m
u
N
l
e
d
o
M
t
i
n
U
M
F
C
r
e
b
m
u
N
l
e
d
o
M
t
i
n
U
M
F
C
A
0
0
0
1
A
0
3
0
9
Z
T
T
2
5
7
0
4
A
0
0
0
1
A
0
3
0
9
Z
W
T
2
5
7
0
4
A
0
0
0
1
A
6
3
0
9
Z
T
T
2
5
7
0
4
A
0
0
0
1
A
6
3
0
9
Z
W
T
2
5
7
0
4
A
0
0
0
1
A
8
4
0
9
Z
T
T
2
5
7
0
4
A
0
0
0
1
A
8
4
0
9
Z
W
T
2
5
7
0
4
A
0
0
0
1
A
0
6
0
9
Z
T
T
2
5
7
0
4
A
0
0
0
1
A
0
6
0
9
Z
W
T
2
5
7
0
4
Required Opening = CFM / 300 FPM
Example:
Given:
Qty of 2 units in an area surrounded by a fence on two sides and solid walls on the other two sides. Units
are 2TTZ9030A100A’s -
Required:
Determine free air opening space required in fence -
Solution:
4075CFM X Qty of 2 = 8150 CFM
8150 CFM / 300 FPM = 27.17 square feet
Round 27.17 to 27 square feet of free air opening in the 2 fence sections surrounding the units.
*Table produced Jan. 2003. For the most current information, please refer to specific equipment Product Data.
Pg. 16
Summary of Contents for XL19i-APG02-EN
Page 19: ...Pg 19 NOTES...