Table 17. Drive terminal specifications
Frame Size
Cable Range
Wire Binding
Screw Torque
Frame 3 Drives (405, 600 A) (2) 1 - 500 KCM
25 ft·lb (34 N·m)
Frame 4 Drives (900, 1200 A) (2) 1/0 - 750 KCM
25 ft·lb (34 N·m)
Input Power and Control Wiring
38
AFDK-SVU01C-EN
Standard Control Wiring
WARNING
Hazardous Voltage with Improper
Grounding!
The motor controller has a chassis ground that MUST
be connected to an earth ground. You MUST follow
requirements for field wiring installation and grounding
as described in NEC and your local/state electrical
codes. Hazardous voltage due to improperly grounded
electrical components could result in death or serious
injury.
indicates the typical control wiring for AFDK
installation. Four knockouts have been provided on the left
side of the AFDK enclosure for control and communication
wires. For exact locations, refer to
and
for Frame 3 units and refer to
and
for Frame 4 units.
Table 18. CVHE, CVHF, & CVHG standard wiring requirements AFD control wiring (between the chiller and the starter)
AFD Starter to Control Panel Control
Wiring
Starter Panel
Terminations
Control Panel
Terminations
(a)
(a) Termination numbers may differ if the controls are CH531 or a Tracer AdaptiView™ controls upgrade.
Comment
AFD 120 volts ac Power Supply (hot)
2X1-1
1X1-1
AFD 120 volts ac Power Supply (neutral)
2X1-15
1X1-12
Ground
2X1-11
1X1-18 or gnd
Panel ground.
Oil Pump Interlock (2K11)
2X1-7, 2X1-8
1A7 to J2-4, J2-2
Normally Open
Condenser High Pressure Cutout (3S1)
2X1-3, 2X1-4
(shield to 2X1-5)
NA
Normally Closed. Operates the gate
kill input on 2A33
Recomm Bus +24 V
2A32-1
1A1-J4-1
4-wire bus WB2 connects to power
supply module 1A1, terminals J4-1,
2, 3, and 4
Recomm Bus Ground
2A32-2
1A1-J4-2
Recomm Bus Com +
2A32-3
1A1-J4-3
Recomm Bus -
2A32-4
1A1-J4-4
Control wiring should be terminated at the terminal block
provided. The location of the control terminal block is
called out as item 13 on
for Frame 3 units and
for Frame 4 units.
shows an expanded view of the terminal block
provided for control wiring. Field-installed control wiring
should be routed so that it is segregated from factory
installed wiring, unless the conductors of both circuits will
be insulated for the maximum voltage of either circuit.