2
V-520 RT Installation Manual
Release History
Released
(07/12)
Rev. 1
(06/12) Pages 8, 10, 20 and 56: added silicone sealant update, page 39; increased compressor oil quantity.
Rev. 2
(09/13) Page 5: changed compressor oil from 203-513 to 203-515.
Rev. 3
(12/13) Pages 8, 13 and 14: changed text and art to clarify the minimum distance required from the cargo wall to the
rear of the evaporator with or without heat option.
Rev. 4
(04/14) Pages 24, 26 and 28: added torque of 60 in-lbs for plastic cover screws.
Rev. 5
(08/14) Pages 9, 20, 21, 54 and 55: Added compressor ground wire.
Rev. 6
(11/15) General update to manual including adding SPR and CPR adjustment procedures, system leak check and
evacuation procedures, updated information on battery connections and how to properly secure maxi fuse holder.
Rev. 7
(01/16) Added new in-line fuse installation procedures.
Summary of Contents for Thermo King ES300
Page 12: ...11 Required Tools ...
Page 18: ...17 Dimensions Condenser Module Mounting Holes ...
Page 19: ...18 Dimensions HMI A 140 mm 5 50 in B 46 mm 1 80 in C 12 mm 50 in ...
Page 20: ...19 BLANK PAGE ...
Page 38: ...37 Important Suction Line Routing and P Trap Formation NOT ACCEPTABLE From Unit ...
Page 40: ...39 Installation Refrigeration Tubes to Compressor ...
Page 46: ...45 System Leak Check and Evacuation ...
Page 48: ...47 Installation Electrical Connections ...
Page 50: ...49 Electrical Connections Evaporator s ...
Page 52: ...51 Installation Standby Power Receptacle ...
Page 54: ...53 Installation Drain Hoses REMOTE Evaporator HOST Evaporator Defrost Heater Wires ...
Page 56: ...55 Installation HMI ...
Page 62: ...61 System Charging AMOUNT OF REFRIGERANT PER MODEL Model 50 5 00 lbs ...