background image

Safety recommendations

To avoid accidents and damage, the following recom-
mendations should be observed during maintenance
and service visits :
1. The maximum allowable pressures for system leak

testing on low and high pressure side are given in the
chapter "Installation". Always provide a pressure regu-
lator.

2. Disconnect the main supply before any servicing on

the unit.

3. Service work on the refrigeration system and the elec-

trical system should be carried out only by qualified
and experienced personnel. 

Maintenance contract

It is strongly recommended that you sign a maintenance
contract with your local Service Agency. This contract
provides regular maintenance of your intallation by a
specialist in our equipment. Regular maintenance
ensures that any malfunction is detected and corrected
in good time and minimizes the  possibility that serious

damage will occur. Finally, regular maintenance ensures
the maximum operating life of your equipment. We
would remind you that failure to respect these installa-
tion and maintenance instructions may result in imme-
diate cancellation of the warranty.

Training

The equipment described in this manual is the result of
many years of research and continuous development.
To assist you in obtaining the best use of it, and maintai-
ning it in perfect operating condition over a long period
of time, the constructor have at your disposal a refrige-
ration and air conditioning service school. The principal
aim of this is to give operators and 

maintenance technicians a better knowledge of the
equipment they are using, or that is under their charge.
Emphasis is particularly given to the importance of per-
iodic checks on the unit operating parameters as well as
on preventive maintenance, which reduces the cost of
owing the unit by avoiding serious and costly break-
down.

The constructor's policy is one continuous product improvement, and he reserves
the right to alter any details of the products at any time without notice

This publication is a general guide to install, use and properly maintain our products.
The information given may be different from the specification for a particular coun-
try or for a specific order. In this event, please refer to your nearest office.

For additional information, contact :

Distributor / Installer stamp

All rights reserved. No part of this publication may be reproduced or transmitted in any
form or by any means without the written authorization of the constructor.

C20 IM 004 E - 1199

Supersedes C20 IM 004 E - 0498

Société Trane  -  Société Anonyme au capital de 41 500 000 F  -  Route de Chamagne - 88130 Charmes -  France - 
Siret  306 050 188-00011  -  RCS  Epinal B 306 050 188 - Numéro d'identification taxe intracommunautaire : FR 83 306050188

An American Standard Company

Summary of Contents for RTAA

Page 1: ...09 110 207 209 210 211 212 213 214 215 216 217 220 324 328 430 432 434 RTAA RTAB Air Cooled Helical Rotary Liquid Chillers Installation Operation Maintenance This manual should be used jointly with th...

Page 2: ...and Maintenance instructions are given as a guide to good practice in the installation put ting into service operation and periodic maintenance by the user of the Trane RTAA RTAB screw compressor liq...

Page 3: ...eeze protection 14 Installation Operating principles 15 Refrigeration cycle 15 Oil system 18 Remote CLD panel wiring 19 Pre start procedure 21 Start up procedure 22 Shut down procedure 23 Operation Ma...

Page 4: ...ivery Notify the carrier s terminal of the damage immediate joint inspection of the damage with the carrier and the consignee Notify the Trane sales representative and arrange for repair Do not repair...

Page 5: ...5 Figure 2 Starter and control panels Figure 3 Starter and control panels...

Page 6: ...215 216 217 220 Nominal Cooling Capacity 1 330 417 452 479 523 567 629 Number of Circuit 2 2 2 2 2 2 2 Number of Compressor 1 1 1 1 1 1 1 1 1 1 1 1 2 2 Maximum FLA 400 50 3 2 A 256 308 331 354 384 414...

Page 7: ...59 132 61 128 128 128 128 132 132 Model RTAB 108 109 110 207 209 210 211 212 213 214 Nominal Cooling Capacity 1 137 153 180 118 146 165 180 215 261 285 Number of Circuit 1 1 1 2 2 2 2 2 2 2 Number of...

Page 8: ...d maintai ning it in perfect operating condition over a long period of time the constructor have at your disposal a refrige ration and air conditioning service school The principal aim of this is to g...

Reviews: