Trane Precedent FIAECON002 Series Installation Instructions Manual Download Page 5

ACC-SVN261A-EN

General Information

Inspection

1. Unpack all components of the kit.
2. Check carefully for shipping damage. If any damage is 

found, report it immediately, and file a claim against the 
transportation company.

3. Visually inspect the components for shipping damage as 

soon as possible after delivery, before it is stored. 
Concealed damage must be reported within 15 days.

4. If concealed damage is discovered, stop unpacking the 

shipment.

5. Do not remove damaged material from the receiving 

location. Take photos of the damage, if possible. The 
owner must provide reasonable evidence that the damage 
did not occur after delivery.

6. Notify the carrier’s terminal of damage immediately by 

phone and by mail. Request an immediate joint inspection 
of the damage by the carrier and the consignee.

Note:

Do not attempt to repair any damaged parts until the 
parts are inspected by the carrier’s representative.

Parts List

One (1) Economizer Assembly

One (1) Mist Eliminator

One (1) Wire Tie

Ten (10) Screws

Actuator Harness

One (1) Grommet (24)

One (1) Duct Blockoff Plate (15)

12 Screws

One (1) Bottom Blockoff (21)

Summary of Contents for Precedent FIAECON002 Series

Page 1: ...es specific knowledge and training Improperly installed adjusted or altered equipment by an unqualified person could result in death or serious injury When working on the equipment observe all precaut...

Page 2: ...at is used in these service procedures In addition some states or municipalities may have additional requirements that must also be adhered to for responsible management of refrigerants Know the appli...

Page 3: ...cies those regulations supersede these policies Non Trane personnel should always follow local regulations Introduction ACC SVN261A EN 3 Copyright This document and the information in it are the prope...

Page 4: ...re the Damper for Horizontal Installation only 6 Optional Sensors 7 Install Duct Blockoff Plate Downflow Units only 7 Install Economizer into the Rooftop Unit 7 Symbio Wiring Connections 7 Factory Ins...

Page 5: ...Do not remove damaged material from the receiving location Take photos of the damage if possible The owner must provide reasonable evidence that the damage did not occur after delivery 6 Notify the c...

Page 6: ...ws into 6 See below figure Figure 2 Assembling the end panel Reconfigure the Damper for Horizontal Installation only The economizer damper is pre configured at the factory for downflow applications Re...

Page 7: ...side the filter section 3 will slip over the three screws 9 Align the holes in the plate with the holes in the panel 10 Secure the bottom right with a screw 22 11 Install the bottom blockoff 21 and se...

Page 8: ...ation See Reconfigure theDamper forHorizontal Installation only p 6 for instructions and then return to this procedure 7 If optional sensors for humidity and temperature monitoring are to be used FIAE...

Page 9: ...tdoor Air Humidity Sensor Return Air Temperature Sensor Return Air Humidity Sensor Reference Enthalpy Outside Air Enthalpy Reference Enthalpy Setpoint Econ Enthalpy Offset AND Outside Air Temperature...

Page 10: ...Notes 10 ACC SVN261A EN...

Page 11: ...Notes ACC SVN261A EN 11...

Page 12: ...gn and specifications without notice We are committed to using environmentally conscious print practices Trane and American Standard create comfortable energy efficient indoor environments for commerc...

Reviews: