![Trane GAF2A0A36S3AEC Installer'S Manual Download Page 19](http://html1.mh-extra.com/html/trane/gaf2a0a36s3aec/gaf2a0a36s3aec_installers-manual_1149568019.webp)
19
Section 7. Setting the Unit - Vertical Installation
7.2 Considerations
Provide a minimum height of 14 inches for proper
unrestricted airflow below the unit. Allow a minimum
of 21 inches clearance in front of the air handler to
permit maintenance and removal of filter.
• Position unit on suitable foundation. If a manu-
facturer approved accessory is not used, a frame
strong enough to support the total weight of the
unit, accessories, and duct work must be provided.
• Isolate unit from the foundation using a suitable
isolating material.
Typical Closet Installation
7.3 Upflow Installation
TASB Installation
1. Assemble the TASB using the TASB’s Installer
Guide.
Contact your distributor for TASB accessories
TASB235SB for use with 23.5” cabinets
TASB175SB for use with 17.5” cabinets
Typical TASB Installation
Airflo
w
Airflow
Airflow
7.1 Secure Coil (GAM2 Vertical Upflow Applications)
STEP 1
- Remove Coil Panel.
STEP 2
- Remove screw from documentation packet.
STEP 3
- While the air handler is in the upflow posi-
tion, use the supplied screw to secure the coil seal
plate to cross member as shown.
Important:
The Coil Seal Plate and screw secure the
coil in the center of the air handler. Failure to follow
these steps can prevent the Coil Panel from being eas-
ily replaced on the unit.
Summary of Contents for GAF2A0A36S3AEC
Page 35: ...35 GAF2 16 2 GAF2 Outline Drawings...
Page 39: ...39...