14
CVHH-SVX001G-EN
Type of Requirement
Trane Supplied
Trane Installed
Trane Supplied
Field Installed
Field Supplied
Field Installed
Water piping
•
Flow sensing devices
(may be field supplied)
•
Taps for flow sensing devices
•
Taps for thermometers and gauges
•
Thermometers
•
Strainers (as required)
•
Water flow pressure gauges
•
Isolation and balancing valves in water piping
•
Vents and drain on waterbox valves (one each per
pass)
•
Pressure relief valves (for waterboxes as required)
Relief
•
Rupture disk assembly
•
RuptureGuard
™
(optional)
•
Vent line and flexible connector and vent line from
rupture disk to atmosphere
Insulation
•
Insulation (optional)
•
Insulation
•
Chiller feet insulation
Water Piping Connection
Components
Flanged (optional)
Flanged (optional)
•
Victaulic
®
to flange
adapter for 150 psig
(1034.2 kPaG)
waterboxes
Victaulic
®
•
Victaulic
®
coupling for 150 psig (1034.2 kPaG) and
300 psig (2068.4 kPaG) waterboxes
•
Fasteners for flanged-type connections (optional)
Other Materials
•
Material and equipment to perform leak testing
•
Dry nitrogen (8 psig [55.2 kPaG] maximum per
machine as needed)
Chiller Installation
Completion and Request
for Trane Service,” p. 119
(CTV-ADF001*-EN; refer
to
)
•
To be completed by installing contractor prior to
contacting Trane for start-up
Chiller start-up
commissioning
(a)
•
Trane, or an agent of
Trane specifically
authorized to perform
start-up of Trane
®
products
Post-commissioning
transport of empty
refrigerant containers for
return or recycling
•
Move empty refrigerant containers to an easily
accessible point of loading
(a)
Start-up must be performed by Trane or an agent of Trane specifically authorized to perform start-up and warranty of Trane
®
products. Contractor shall
provide Trane (or an agent of Trane specifically authorized to perform start-up) with notice of the scheduled start-up at least two weeks prior to the
scheduled start-up.
Storage Requirements
N
NO
OT
TIIC
CE
E
IIn
nssu
ulla
attiio
on
n D
Da
am
ma
ag
ge
e!!
F
Fa
aiillu
urre
e tto
o ffo
ollllo
ow
w tth
he
esse
e iin
nssttrru
uccttiio
on
nss cco
ou
ulld
d rre
essu
ulltt iin
n
iin
nssu
ulla
attiio
on
n d
da
am
ma
ag
ge
e..
T
To
o p
prre
ev
ve
en
ntt d
da
am
ma
ag
ge
e tto
o ffa
acctto
orry
y iin
nsstta
alllle
ed
d iin
nssu
ulla
attiio
on
n::
••
D
Do
o n
no
ott a
allllo
ow
w tth
he
e iin
nssu
ulla
attiio
on
n tto
o b
be
e e
ex
xp
po
osse
ed
d tto
o
e
ex
xcce
essssiiv
ve
e ssu
un
nlliig
gh
htt.. S
Stto
orre
e iin
nd
do
oo
orrss o
orr cco
ov
ve
err w
wiitth
h
cca
an
nv
va
ass tto
o p
prre
ev
ve
en
ntt e
ex
xp
po
ossu
urre
e..
••
D
Do
o n
no
ott u
usse
e tth
hiin
nn
ne
errss a
an
nd
d sso
ollv
ve
en
nttss o
orr o
otth
he
err tty
yp
pe
ess
o
off p
pa
aiin
ntt.. U
Usse
e o
on
nlly
y w
wa
atte
err b
ba
asse
e lla
atte
ex
x..
Summary of Contents for CVHH CenTraVac
Page 126: ...126 CVHH SVX001G EN N No ot te es s ...