Table 1. Installation requirements
Type of
Trane-Supplied
Trane-Supplied
Field-Supplied
Requirement
Trane-Installed
Field-Installed
Field-Installed
Rigging
A. Safety chains
B. Clevis connectors
C. Lifting beam
Isolation
A. Isolation pads or
A. Isolation pads or spring isolators
spring isolators
Electrical
A. Circuit breakers or
A. Jumper bars
A. Circuit breakers or fusible
fusible disconnects
B. Temperature sensor
disconnects (optional)
(optional)
(optional outdoor air)
B. Remote-mounted starter,
B. Unit-mounted
C. Flow switches (may
AFD (optional)
starter (optional)
be field supplied)
C. PFCCs (Remote-mounted
C. PFCCs (optional)
starter option only)
D. Terminal lugs
E. Ground connection(s)
F. Jumper bars
G. BAS wiring (optional)
H. IPC wiring (AFD and remote-
mounted starters only
I. Control voltage wiring (AFD and
remote-mounted starters only)
J. Oil pump interlock wiring
(AFD and remote-mounted
starters only)
K. High condenser pressure
interlock wiring (AFD and
remote-mounted starters only).
L. Chilled water pump contactor
and wiring
M. Condenser water pump
contactor and wiring
N. Option relays and wiring
(See Table 12)
Water Piping
A. Flow switches (May
A. Thermometers
be field supplied)
B. Water flow pressure gauges
C. Isolation and balancing valves
water piping
D. Vents and drain valves
(1 each per class)
E. Pressure-relief valves
(for water boxes as required)
Rupture Disc
A. Rupture disc assy
A. Vent line and flexible connector
Insulation
A. Insulation (Optional)
A. Insulation