Trane CenTraVac CDHF Assembly/Disassembly Manual Download Page 31

CVHE-SVN04M-EN

31

Reassembly

N

NO

OT

TIIC

CE

E

E

Eq

qu

uiip

pm

me

en

ntt D

Da

am

ma

ag

ge

e!!

F

Fa

aiillu

urre

e tto

o rre

em

mo

ov

ve

e tth

he

e ssttrra

aiin

n rre

elliie

eff w

wiitth

h tth

he

e sse

en

nsso

orr

cco

ou

ulld

d rre

essu

ulltt iin

n e

eq

qu

uiip

pm

me

en

ntt d

da

am

ma

ag

ge

e..

D

Do

o N

NO

OT

T a

atttte

em

mp

ptt tto

o p

pu

ullll sse

en

nsso

orr b

bu

ullb

b tth

hrro

ou

ug

gh

h tth

he

e

ssttrra

aiin

n rre

elliie

eff;; a

allw

wa

ay

yss rre

em

mo

ov

ve

e tth

he

e e

en

nttiirre

e ssttrra

aiin

n rre

elliie

eff

w

wiitth

h tth

he

e sse

en

nsso

orr..

It is important to remove used O-rings and gaskets and
clean joints before reassembling the compressor with
new O-rings and gaskets. All necessary replacement O-
rings and gaskets are supplied by the factory when the
compressor doweling or separable shell options are
ordered.

Use the following procedure to reattach the
compressor/motor assembly to the chiller.

1. Remove the protective covers on all compressor,

condenser, and evaporator connections. Clean all
mating surfaces using Loctite® “Chisel” cleaner or
CRC® Industrial Gasket Remover. Completely
remove old sealing compound from O-ring
grooves. Use Loctite “N” primer for final surface
preparation.

2. Refer to CTV-SB-66F (

General Service Bulletin:

CenTraVac O-Ring and Flange Sealant

), or the most

recent version, for proper installation of gaskets, O-
Rings, and Loctite sealant. Install a new O-ring on
the compressor discharge connection mating
surfaces. Use Loctite 515 “Gasket Eliminator” to
lubricate the O-ring and provide additional sealing.
This is the only sealing compound recommended
by Trane for use on O-ring joints. To use this
sealing compound, apply a light bead
(approximately 1/8-in. in diameter) to the O-ring
groove, insert the O-ring and then apply a light
bead to the O-ring. Also apply a 1/8-in. bead of
sealing compound between the O-ring groove and
the bolt hole circle. The parts can now be
assembled.

3. Lift the compressor/motor assembly into place.

Insert the bolts in the compressor foot and
discharge flange connections. Before tightening
any of these bolts, reinstall the dowel pins in the
compressor foot and discharge flange.

4. Tighten the compressor foot and discharge flange

bolts. See

Table 13, p. 32

for bolt torque

specifications.

5. Install and tighten the motor mount bolts. See

Table 13, p. 32

for bolt torque specifications.

6. Remove the lifting equipment.

7. Set up dial indicators on the compressor end of the

compressor/motor assembly. See

Figure 23, p. 31

.

The dial indicators are used to monitor horizontal
and vertical movement of the compressor/motor

assembly when the suction elbow retaining bolts
are tightened. Support the dial indicators from the
condenser or from a floor stand.

Figure 23.

Suction elbow flange bolts

Set Up Dial

Indicator to Read

Horizontally

Set Up Dial Indicator

to Read Vertically

8. Clean the suction elbow flange surfaces and O-ring

grooves per

Step 1

For the evaporator to suction

elbow joint, use Loctite 515 per

Step 2

For the

suction elbow to compressor joint, use 1/8-in.
GORE-TEX® Joint Sealant placed approximately 1/
8-in. in board of the O-ring groove. This is used in
addition to the O-ring. As an option, Loctite 515
may be used in place of GORE-TEX. However, great
care must be taken to prevent the sealant from
entering the first stage IGV housing. Refer to CTV-
SB-66F (

General Service Bulletin: CenTraVac O-Ring

and Flange Sealant

), or the most recent version.

9. Lift the suction elbow into place using a sling or

chain-fall hoist.

10. Install the suction elbow retaining bolts.

11. Tighten the retaining bolts only “hand tight”.

Tighten two retaining bolts, 180 degrees apart at
the compressor connection. Then tighten two bolts,
180 degrees apart at the evaporator connection.
Alternate between connections until all retaining
bolts are tight. Monitor the dial indicators to ensure
that there is no more than 0.010 inches of
compressor movement. If there is more movement
than this, loosen all of the bolts, “zero” the dial
indicators and repeat the procedure.

Figure 23, p.

31

illustrates the bolt tightening sequence.

12. Reconnect the economizer vent pipes. Be sure to

clean the mating surfaces and use new gaskets on
the connections. Tighten the flange bolts just
enough so that the gasket material just begins to
extrude from between the flanges.

Summary of Contents for CenTraVac CDHF

Page 1: ...knowledge and training Improperly installed adjusted or altered equipment by an unqualified person could result in death or serious injury When working on the equipment observe all precautions in the...

Page 2: ...th he e j jo ob b b be ei in ng g u un nd de er rt ta ak ke en n c co ou ul ld d r re es su ul lt t i in n d de ea at th h o or r s se er ri io ou us s i in nj ju ur ry y T Te ec ch hn ni ic ci ia an...

Page 3: ...11 Factory Warranty Information Compliance with the following is required to preserve the factory warranty A Al ll l U Un ni it t I In ns st ta al ll la at ti io on ns s Startup MUST be performed by...

Page 4: ...ta an nt t These procedures do NOT apply to units that have been installed and electrical supply wiring has been completed Contractor Responsibilities W WA AR RN NI IN NG G H He ea av vy y O Ob bj je...

Page 5: ...pass INDP Optional industrial control package SMP Optional supplemental motor protection INDP units only UAFD Unit mounted Adaptive Frequency drive UATR Unit mounted medium voltage auto transformer UP...

Page 6: ...42 0 78 3 51 3 59 1 93 8 45 5 62 2 63 5 44 3 620 870 080 870 93 5 75 0 101 3 42 0 81 2 59 7 73 2 93 8 45 5 63 9 63 5 44 3 080 142 870 101 3 79 4 107 5 a 81 3 59 7 73 2 102 0 45 5 67 9 63 59 46 0 142...

Page 7: ...102 0 45 5 64 3 63 59 46 0 142 920 98 1 84 0 111 0 a 93 2 54 3 68 0 105 5 46 9 69 8 62 5 46 0 142 210 920 106 0 89 7 109 7 a 93 3 54 6 68 7 105 4 46 9 76 2 62 5 52 4 210 920 106 5 96 0 116 0 a 93 2 54...

Page 8: ...21 1 36 8 126 9 129 0 N A N A 72 7 210 1300 93 8 76 4 86 9 N A 21 1 36 8 124 7 135 2 87 2 87 2 82 4 250 1300 97 9 80 4 90 9 N A 18 6 36 8 137 2 139 4 N A N A 82 7 1470 1720 142 210 1720 86 5 72 8 83 3...

Page 9: ...9 77 5 N A 146 0 91 0 4 6 142 210 1300 a a a a 147 9 83 6 3 5 154 9 90 6 5 6 210 1300 a a a a N A N A N A 152 4 95 9 3 9 250 1300 140 7 b 80 2 a N A N A N A 160 0 99 5 3 1 1470 1720 142 210 1720 a a a...

Page 10: ...SEE NOTE 4 N No ot te es s 1 All dimensions are in inches 0 5 inch See Table 1 p 6 through Table 5 p 13 for dimension tables 2 UAFD brackets and supports shown are bolt on and removable Most brackets...

Page 11: ...ble See Table 5 p 13 for application dimensions 3 Applies only to CVHE 190 320 NTON on 032 shells with free cooling option 4 Add 1 5 inch for distance to Tracer Adaptiview display mounting arm in stow...

Page 12: ...N A 5000 a N A a N A 5800 a N A 123 4 N A 870 1300 440E a a a a 5000 a a a a 5800 a a 123 4 123 7 Table 4 Motor terminal boxes for CVHE CVHF and CVHG CenTraVac chillers continued Shell Size Comp Size...

Page 13: ...5 69 3 75 9 050 080 480 400 92 4 N A 51 59 N A 440E 94 9 101 6 54 09 60 85 500 400 92 4 N A 51 59 N A 440E 94 9 101 6 54 09 60 85 565 440E 96 2 103 0 54 09 60 85 5000 97 7 104 3 55 59 62 19 080 142 7...

Page 14: ...1 9 52 4 93 8 2250 2 Comp 2500 120 9 0 5 121 6 73 2 94 2 59 7 120 6 116 4 54 5 79 7 76 9 56 8 94 6 CDHF 3000 2 Comp 250M 120 9 0 5 121 6 76 3 92 3 63 1 120 6 116 4 54 5 84 3 76 9 56 8 96 8 3500 2 Comp...

Page 15: ...7 1 3 092 1100 440E 6 8 11 8 13 1 3 1 5000 6 8 11 8 11 6 1 6 5800 6 8 11 8 9 8 0 2 2500 130 440E 3 6 0 5 21 1 11 1 5000 3 6 2 0 19 6 9 6 5800 3 6 3 8 17 8 7 8 092 110 440E 3 6 5 5 21 1 11 1 5000 3 6 7...

Page 16: ...PORTS CAN BE UNBOLTED FROM BRACKETS AFD CONTROL PANEL Y2 UATR UPIR UXL STARTERS Y3 MOTOR TERMINAL BOX NOT SHOWN Y1 USTR USID STARTERS CONTROL PANEL K X Z W 1 0 90D 1210A AFD AFD DISCONNECT SWITCH TO E...

Page 17: ...TS ARE WELDED TO EVAPORATOR ON 900 1210A AFD SUPPORTS CAN BE UNBOLTED FROM BRACKETS LARGEST MOTOR MOTOR S SPACE REMOVAL T MAX OD LARGEST MOTOR CHILLER DIMENSIONS INCHES F C CDHF UNIT SHOWN COOLING ONL...

Page 18: ...d 10 a Heaviest motor used does not include the weight of the suction elbow b For Duplex chillers weights shown are for individual components multiply by two for total component weights for Duplex chi...

Page 19: ...g 5190 f 250M 2500 28679 13008 10954 f 4969 f 29817 13524 11442 f 5190 f 250X 2500 31902 14470 10954 f 4969 f 33486 15188 11442 f 5190 f Note All weights are nominal and 10 a Bundle weights are for th...

Page 20: ...units ship with a 5 psig 34 5 kPag dry nitrogen holding charge at nominal 72 F 22 C I Im mp po or rt ta an nt t New units that have been factory run tested contain residual refrigerant vent discharge...

Page 21: ...t te e d di is sc co on nn ne ec ct ts s a an nd d d di is sc ch ha ar rg ge e a al ll l m mo ot to or r s st ta ar rt t r ru un n c ca ap pa ac ci it to or rs s b be ef fo or re e s se er rv vi ic ci...

Page 22: ...t ta al ll le ed d a an nd d i it t i is s n ne ec ce es ss sa ar ry y t to o i in ns st ta al ll l d do ow we el li in ng g c co on nt ta ac ct t t th he e l lo oc ca al l T Tr ra an ne e S Se er rv...

Page 23: ...at te e f fo or r r re ef fr ri ig ge er ra an nt t t ty yp pe e D Do o n no ot t u us se e n no on n a ap pp pr ro ov ve ed d r re ef fr ri ig ge er ra an nt ts s r re ef fr ri ig ge er ra an nt t s...

Page 24: ...l ly y f fo or r r re em mo ov vi in ng g w wa at te er rb bo ox x f fr ro om m c ch hi il ll le er r 6 Remove the suction elbow There are two styles of suction elbows a 90 elbow and a three piece elb...

Page 25: ...i ic ch h c co ou ul ld d r re es su ul lt t i in n d de ea at th h o or r s se er ri io ou us s i in nj ju ur ry y o or r e eq qu ui ip pm me en nt t d da am ma ag ge e S Sy ys st te em m c co on nt...

Page 26: ...essor 11 Use the reverse order to reassemble the economizer on the chiller Be sure to install new gaskets at the appropriate joints 12 Torque all bolts to specifications Consult with your Trane servic...

Page 27: ...er r N NF FP PA A 7 70 0E E t th ha at t a al ll l c ca ap pa ac ci it to or rs s h ha av ve e d di is sc ch ha ar rg ge ed d F Fo or r a ad dd di it ti io on na al l i in nf fo or rm ma at ti io on...

Page 28: ...ie es s o on ne e a at t a a t ti im me e 5 Loosen the bolts which hold the starter to the flange on the motor Steady the starter panel as the retaining bolts are removed because the panel will tip fo...

Page 29: ...ge er ra an nt t s su ub bs st ti it tu ut te es s o or r n no on n a ap pp pr ro ov ve ed d r re ef fr ri ig ge er ra an nt t a ad dd di it ti iv ve es s W WA AR RN NI IN NG G H He ea av vy y O Ob b...

Page 30: ...sed for removing the suction elbow Do not lift the piping simply support it to avoid slipping as the bolts are removed from the connecting flanges Typical rigging for lifting the suction elbow can be...

Page 31: ...ot and discharge flange connections Before tightening any of these bolts reinstall the dowel pins in the compressor foot and discharge flange 4 Tighten the compressor foot and discharge flange bolts S...

Page 32: ...ba ac ck k t to o a at tm mo os sp ph he er ri ic c p pr re es ss su ur re e b be ef fo or re e o op pe en ni in ng g s sy ys st te em m f fo or r r re ep pa ai ir rs s M Mi ix xt tu ur re es s o of f...

Page 33: ...CVHE CVHF CVHG Water Cooled CenTraVac Chillers with Tracer AdaptiView Control and CDHF SVX01 EN Installation Operation and Maintenance CDHF and CDHG Water Cooled CenTraVac Chillers with Tracer Adapti...

Page 34: ...34 CVHE SVN04M EN N No ot te es s...

Page 35: ...CVHE SVN04M EN 35 N No ot te es s...

Page 36: ...protect food and perishables and increase industrial productivity and efficiency We are a global business committed to a world of sustainable progress and enduring results ingersollrand com Ingersoll...

Reviews: