Trane BAYVALV001 Installation Manual Download Page 6

6

ACC-SVN213B-EN

Installation

W

WA

AR

RN

NIIN

NG

G

H

Ha

azza

arrd

do

ou

uss V

Vo

olltta

ag

ge

e w

w//C

Ca

ap

pa

acciitto

orrss!!

F

Fa

aiillu

urre

e tto

o d

diisscco

on

nn

ne

ecctt p

po

ow

we

err a

an

nd

d d

diisscch

ha

arrg

ge

e

cca

ap

pa

acciitto

orrss b

be

effo

orre

e sse

errv

viicciin

ng

g cco

ou

ulld

d rre

essu

ulltt iin

n d

de

ea

atth

h o

orr

sse

erriio

ou

uss iin

njju

urry

y..

D

Diisscco

on

nn

ne

ecctt a

allll e

elle

eccttrriicc p

po

ow

we

err,, iin

nccllu

ud

diin

ng

g rre

em

mo

otte

e

d

diisscco

on

nn

ne

eccttss a

an

nd

d d

diisscch

ha

arrg

ge

e a

allll m

mo

otto

orr sstta

arrtt//rru

un

n

cca

ap

pa

acciitto

orrss b

be

effo

orre

e sse

errv

viicciin

ng

g.. F

Fo

ollllo

ow

w p

prro

op

pe

err

llo

occkko

ou

utt//tta

ag

go

ou

utt p

prro

occe

ed

du

urre

ess tto

o e

en

nssu

urre

e tth

he

e p

po

ow

we

err

cca

an

nn

no

ott b

be

e iin

na

ad

dv

ve

errtte

en

nttlly

y e

en

ne

errg

giizze

ed

d.. F

Fo

orr v

va

arriia

ab

blle

e

ffrre

eq

qu

ue

en

nccy

y d

drriiv

ve

ess o

orr o

otth

he

err e

en

ne

errg

gy

y sstto

orriin

ng

g

cco

om

mp

po

on

ne

en

nttss p

prro

ov

viid

de

ed

d b

by

y T

Trra

an

ne

e o

orr o

otth

he

errss,, rre

effe

err tto

o

tth

he

e a

ap

pp

prro

op

prriia

atte

e m

ma

an

nu

uffa

accttu

urre

err’’ss lliitte

erra

attu

urre

e ffo

orr

a

allllo

ow

wa

ab

blle

e w

wa

aiittiin

ng

g p

pe

erriio

od

dss ffo

orr d

diisscch

ha

arrg

ge

e o

off

cca

ap

pa

acciitto

orrss.. V

Ve

erriiffy

y w

wiitth

h a

a C

CA

AT

T IIIIII o

orr IIV

V v

vo

ollttm

me

ette

err

rra

atte

ed

d p

pe

err N

NF

FP

PA

A 7

70

0E

E tth

ha

att a

allll cca

ap

pa

acciitto

orrss h

ha

av

ve

e

d

diisscch

ha

arrg

ge

ed

d..

F

Fo

orr a

ad

dd

diittiio

on

na

all iin

nffo

orrm

ma

attiio

on

n rre

eg

ga

arrd

diin

ng

g tth

he

e ssa

affe

e

d

diisscch

ha

arrg

ge

e o

off cca

ap

pa

acciitto

orrss,, sse

ee

e P

PR

RO

OD

D--S

SV

VB

B0

06

6*

*--E

EN

N..

W

WA

AR

RN

NIIN

NG

G

E

Ex

xp

pllo

ossiio

on

n H

Ha

azza

arrd

d!!

F

Fa

aiillu

urre

e tto

o ffo

ollllo

ow

w iin

nssttrru

uccttiio

on

nss b

be

ello

ow

w cco

ou

ulld

d rre

essu

ulltt iin

n

a

an

n e

ex

xp

pllo

ossiio

on

n w

wh

hiicch

h cco

ou

ulld

d rre

essu

ulltt iin

n d

de

ea

atth

h o

orr

sse

erriio

ou

uss iin

njju

urry

y,, a

an

nd

d e

eq

qu

uiip

pm

me

en

ntt d

da

am

ma

ag

ge

e..

N

NE

EV

VE

ER

R b

by

yp

pa

assss ssy

ysstte

em

m ssa

affe

ettiie

ess iin

n o

orrd

de

err tto

o p

pu

um

mp

p

d

do

ow

wn

n tth

he

e u

un

niitt cco

om

mp

po

on

ne

en

ntt''ss rre

effrriig

ge

erra

an

ntt iin

ntto

o tth

he

e

m

miiccrro

occh

ha

an

nn

ne

ell h

he

ea

att e

ex

xcch

ha

an

ng

ge

err ((M

MC

CH

HE

E)) cco

oiill.. D

Do

o

N

NO

OT

T d

de

ep

prre

essss tth

he

e cco

om

mp

prre

esssso

orr cco

on

ntta

acctto

orr ssiin

ncce

e iitt

e

effffe

eccttiiv

ve

elly

y b

by

yp

pa

asssse

ess tth

he

e h

hiig

gh

h--p

prre

essssu

urre

e cco

on

nttrro

oll..

W

WA

AR

RN

NIIN

NG

G

R

Re

effrriig

ge

erra

an

ntt V

Va

ap

po

orr H

Ha

azza

arrd

d!!

R

Re

effrriig

ge

erra

an

ntt v

va

ap

po

orrss m

ma

ay

y cco

olllle

ecctt a

an

nd

d cco

on

ncce

en

nttrra

atte

e iin

n

cco

on

nffiin

ne

ed

d ssp

pa

acce

ess o

orr llo

ow

w lly

yiin

ng

g a

arre

ea

ass w

wh

hiicch

h w

wiillll

rre

essu

ulltt iin

n tth

he

e d

diissp

plla

acce

em

me

en

ntt o

off a

aiirr.. T

Th

hiiss p

po

osse

ess a

a

p

po

otte

en

nttiia

all h

he

ea

alltth

h rriisskk d

du

ue

e tto

o ssu

uffffo

occa

attiio

on

n.. F

Fa

aiillu

urre

e tto

o

ffo

ollllo

ow

w p

prro

op

pe

err h

ha

an

nd

dlliin

ng

g g

gu

uiid

de

elliin

ne

ess cco

ou

ulld

d rre

essu

ulltt iin

n

d

de

ea

atth

h o

orr sse

erriio

ou

uss iin

njju

urry

y..

R

Re

effe

err tto

o tth

he

e a

ap

pp

prro

op

prriia

atte

e M

MS

SD

DS

S o

orr S

SD

DS

S ssh

he

ee

ettss a

an

nd

d

O

OS

SH

HA

A//G

GH

HS

S g

gu

uiid

de

elliin

ne

ess ffo

orr iin

nffo

orrm

ma

attiio

on

n rre

effe

errrriin

ng

g tto

o

a

allllo

ow

wa

ab

blle

e p

pe

errsso

on

na

all e

ex

xp

po

ossu

urre

e lle

ev

ve

ellss a

an

nd

d h

ha

an

nd

dlliin

ng

g

g

gu

uiid

de

elliin

ne

ess..

Preparation

1. Ensure all power to the unit has been disconnected

and locked out.

2. Remove compressor access panel(s)

IIm

mp

po

orrtta

an

ntt:: R-410A refrigerant must not be vented

to the atmosphere!

3. For new installations, release the nitrogen holding

charge by removing line connection caps and
slowly opening the access port. For existing
installations, properly recover R-410A from the
system.

4. Check the service valve diagrams (see Figures 2, p.

xx), to determine the location for cutting the tubing
and placing the valves in the refrigerant lines.

5. Locate screw holes on tube support for mounting

service valves, see Figure 5, p. 9. Mount service
valve using the provided screws. For all R410A 5-
12.5 ton dual circuit, cooling only and heat pump
units, the suction service valve should be placed
outside the unit on the tubing as shown in Figure X,
p. x.

W

WA

AR

RN

NIIN

NG

G

R

Re

effrriig

ge

erra

an

ntt u

un

nd

de

err H

Hiig

gh

h P

Prre

essssu

urre

e!!

F

Fa

aiillu

urre

e tto

o ffo

ollllo

ow

w iin

nssttrru

uccttiio

on

nss b

be

ello

ow

w cco

ou

ulld

d rre

essu

ulltt iin

n

a

an

n e

ex

xp

pllo

ossiio

on

n w

wh

hiicch

h cco

ou

ulld

d rre

essu

ulltt iin

n d

de

ea

atth

h o

orr

sse

erriio

ou

uss iin

njju

urry

y o

orr e

eq

qu

uiip

pm

me

en

ntt d

da

am

ma

ag

ge

e..

S

Sy

ysstte

em

m cco

on

ntta

aiin

nss rre

effrriig

ge

erra

an

ntt u

un

nd

de

err h

hiig

gh

h p

prre

essssu

urre

e..

R

Re

ecco

ov

ve

err rre

effrriig

ge

erra

an

ntt tto

o rre

elliie

ev

ve

e p

prre

essssu

urre

e b

be

effo

orre

e

o

op

pe

en

niin

ng

g tth

he

e ssy

ysstte

em

m.. S

Se

ee

e u

un

niitt n

na

am

me

ep

plla

atte

e ffo

orr

rre

effrriig

ge

erra

an

ntt tty

yp

pe

e.. D

Do

o n

no

ott u

usse

e n

no

on

n--a

ap

pp

prro

ov

ve

ed

d

rre

effrriig

ge

erra

an

nttss,, rre

effrriig

ge

erra

an

ntt ssu

ub

bssttiittu

utte

ess,, o

orr rre

effrriig

ge

erra

an

ntt

a

ad

dd

diittiiv

ve

ess..

6. Clean, cut and fit the tubing using the following

steps:

a. Clean the outside surface of tube with

sandpaper or steel wool at the location you plan
to cut and install the “T” coupling. When cutting
the tubing always use a tube cutter.

b. After the tubing has been cut, its ends must be

scraped or reamed with a pointed tool to
remove any sharp burr in the end of the tube.

c. Using a clean dry cloth, wipe away any small

metal particles that may be in or around newly
cut edges.

Summary of Contents for BAYVALV001

Page 1: ...Odyssey Split System Cooling and Heat Pump 6 to 25 Ton Units B BA AY YV VA AL LV V0 00 01 1 Used with TTA0604 A TTA0724 A TTA0764 A TTA090 A TTA1014 A TTA120 A TTA1014 C TTA1204 C TWA0604 A TWA0724 A...

Page 2: ...r r p pr ro op pe er r P PP PE E f fo or r t th he e j jo ob b b be ei in ng g u un nd de er rt ta ak ke en n c co ou ul ld d r re es su ul lt t i in n d de ea at th h o or r s se er ri io ou us s i i...

Page 3: ...RN NI IN NG G E Ex xp pl lo os si io on n H Ha az za ar rd d F Fa ai il lu ur re e t to o f fo ol ll lo ow w i in ns st tr ru uc ct ti io on ns s b be el lo ow w c co ou ul ld d r re es su ul lt t i i...

Page 4: ...A TWA0764 D TWA0724 A TWA0904 D TWA1014 A TWA1014 D TWA1204 A TWA1204 D TTA0902 A TTA1202 A TWA0902 A TWA1202 A The service valve kit allows technicians to isolate the outdoor unit from the air handle...

Page 5: ...Assembly Number Description 1 Suction Valve Ball 2 Suction Valve Ball dual circuit kits only 3 Liquid Valve Ball 4 Liquid Valve Ball dual circuit kits only 5 Screw 10 16 X 50 Sh Met 6 Literature Insta...

Page 6: ...co on nc ce en nt tr ra at te e i in n c co on nf fi in ne ed d s sp pa ac ce es s o or r l lo ow w l ly yi in ng g a ar re ea as s w wh hi ic ch h w wi il ll l r re es su ul lt t i in n t th he e d...

Page 7: ...ALVE EXPANSION VALVE BULB EQUALIZER TUBE NOTE A NOTE A NOTE A NOTE A HIGH PRESSURE SWITCH HPCO GAUGE CONNECTION DISCHARGE TEMPERATURE LIMIT DTL NOTE B DUAL CIRCUIT MODELS HAVE 2 REFRIGERATION CIRCUITS...

Page 8: ...ce et ty yl le en ne e o ox xy yg ge en n o or r c co om mp pr re es ss se ed d a ai ir r o or r m mi ix xt tu ur re es s c co on nt ta ai in ni in ng g t th he em m f fo or r p pr re es ss su ur re...

Page 9: ...n A Ai ir r A Ac ct t o or r o ot th he er r s st ta at te e o or r l lo oc ca al l c co od de es s a as s a ap pp pr ro op pr ri ia at te e A Af ft te er r r re ef fr ri ig ge er ra an nt t r re em m...

Page 10: ...10 ACC SVN213B EN N No ot te es s...

Page 11: ...ACC SVN213B EN 11 N No ot te es s...

Page 12: ...t trane com or americanstandardair com Trane and American Standard have a policy of continuous product and product data improvement and reserve the right to change design and specifications without no...

Reviews: