
5
18-GJ11D1-2
STEP 1
. Remove coil panel. See the air handler Installer’s Guide
for additional information if needed.
Right Side UV Lamp bracket installation
STEP 2
. Cut the cable tie from the right side lamp bracket as-
sembly. Slide the lamp and reflector assembly out of the
bracket as shown.
STEP 3
. Measure 7.5 inches above the cross bar and make
a mark on the inside of the air handler cabinet (use a
screwdriver or other metal object to scribe line).
STEP 4
. Draw a level line to the back of the air handler
cabinet. This line will be used as a guide for the proper
placement of the lamp bracket. The bottom of the lamp
bracket will line up with the scribe line.
End View
Cross Bar
r La
mp
acke
t
3. Scribe Ho
rizontal Li
ne
Locating
Bottom of
Lamp
Brac
ket
Lamp Brac
ket - Right Side
the right
of the te
mplat
e.
7.5”
Summary of Contents for BAYUVCLK001
Page 15: ...15 18 GJ11D1 2 Wiring Diagram...