![Trane BAYSENS050m Installation Manual Download Page 5](http://html1.mh-extra.com/html/trane/baysens050m/baysens050m_installation-manual_1148932005.webp)
ACC-SVN129D-EN
5
Installation
1. Before beginning installation, remove power from the Unit.
2. Check to make sure all necessary parts were included in the kit.
3.
12 ½ - 25 ton units
:
Use the two #8-32 x ½" screws to mount the bracket to holes in front of
the ReliaTel RTRM board in the Voyager control box. See
3-10 ton units
: Use the two #10-32 x ½" screws to mount the bracket. See
6 - 7½ ton split system units
: If the control box does not have pre-drilled holes to mount
the bracket, using a #29 drill (Diameter 0.136" hole), drill two engagement holes in the right-
hand back corner of the control box floor. Use the two #8-32 x 1/2" screws to mount the bracket
to the Odyssey control box. See
.
10 - 12½ ton split system units
: If the control box does not have pre-drilled holes to mount
the bracket, using a #29 drill (Diameter 0.136" hole), drill two engagement holes in the front
edge of the control box floor. Use the two #8-32 x 1/2" screws to mount the bracket to the
Odyssey control box. See
.
15 - 25 ton split system units:
Using a #29 drill (Diameter 0.136" hole), drill two engagement
holes in the floor of the low voltage section of the control box. Use the two #8-32 x 1/2" screws
to mount the bracket to the Odyssey control box. See
Figure 1.
12 ½ - 25 Ton Packaged Rooftop Units