3
Figure 3. BAYCCHT102AA and BAYCCHT404BA (Scroll Compressor)
Figure 4. Single Phase Wiring
Field Wiring =
Factory Wiring =
GNDWire
Screw
CCCompressorContactor
Load
Line
Compressor
BlowerCompartment
CompressorCompartment
Control BoxCompartment
Page 1: ...rical supply must be disconnected and the main gas valve must be turned off If operating checks must be per formed with the unit operating it is the technicians respon sibility to recognize these hazards and proceed safely WARNING Installation 1 Set the thermostat to OFF 2 Open all unit electrical switches 3 Remove the unit s Control Box Blower and Compressor ac cess panels 4 Open the Crankcase He...
Page 2: ... unit Refer to Figure 5 if you have a three phase unit NOTE Connect both leads on the line side of the contactor See Figures 4 page 3 or 5 page 4 9 Secure the crankcase heater leads with wire ties Care must be taken to ensure the leads do not come in contact with the compressor discharge line with any moving parts or any sharp edges 10 Place the wiring diagram provided with the kit on the inside o...
Page 3: ...2AA and BAYCCHT404BA Scroll Compressor Figure 4 Single Phase Wiring Field Wiring Factory Wiring GND Wire Screw CC Compressor Contactor Load Line Compressor Blower Compartment Compressor Compartment Control Box Compartment ...
Page 4: ... TX 75707 9010 The manufacturer has a policy of continuous product and product data improvement and it reserves the right to change design and specification without notice 2010 Trane Figure 5 Three Phase Wiring Field Wiring Factory Wiring ...