
ACC-SVN156E-EN
11
Installation — Precedent™
1. Assemble block-off panel. Attach 1, 2 and 3 using six
screws.
Figure 20.
Block-off panels
1
2
3
2. Cut one piece of gasket (item 11) to a length of
4.3 inches. Attach to the bottom of the side block-off
panel (item 1) leaving a 0.5 inch gap from surface A.
Figure 21.
Attach gasket to side block-off panel
2
1
11
a.
Standard and Low Leak Economizer:
If
comparative enthalpy is installed, attach the return
air humidity (RAH) and return air temperature (RAT)
sensors to intermediate block-off panel (item 2) and
insert bushing into hole provided on block-off panel.
Connect RAH wire harness onto RAH sensor and
route wires through bushing.
Note:
See the Comparative Enthalpy Installation
Instructions (ACC-SVN235*-EN) for further
details.
Figure 22.
Attach RAH & RAT sensors to block-off
panel
RAT Sensor
RAH Sensor
Bushing
3. Attach one piece of gasket (item 11) to the base:
a.
Standard Economizer:
Align gasket with the
return air damper (RAD) bracket.
Figure 23.
Attach gasket to base (standard
economizer)
RAD Bracket
b.
Low Leak Economizers:
Align gasket with the
return air damper flange as shown in
Summary of Contents for BAYBARO300 Series
Page 14: ...14 ACC SVN156E EN Notes ...
Page 15: ...ACC SVN156E EN 15 Notes ...