Trane A4AC4018A Installer'S Manual Download Page 3

88-A4AC4001-1G-EN 

 

    3 

Table of Contents

Section 1. Safety ............................................................................................................................................................ 2
Section 2. Unit Location Considerations .................................................................................................................... 4
Section 3. Unit Preparation........................................................................................................................................... 5
Section 4. Setting the Unit ............................................................................................................................................ 6
Section 5. Refrigerant Line Considerations ................................................................................................................ 6
Section 6. Refrigerant Line Routing ............................................................................................................................ 8
Section 7. Refrigerant Line Brazing ............................................................................................................................. 9
Section 8. Refrigerant Line Leak Check .................................................................................................................... 11
Section 9. Evacuation ................................................................................................................................................. 11
Section 10. Service Valves ......................................................................................................................................... 12
Section 11. Electrical - Low Voltage .......................................................................................................................... 13
Section 12. Electrical - High Voltage ......................................................................................................................... 15
Section 13. Start Up..................................................................................................................................................... 16
Section 14. System Charge Adjustment (Systems can be rated with TXV, EEV or Piston) ................................. 17
Section 15. Checkout Procedures and Troubleshooting ......................................................................................... 22
Section 16. Refrigerant Circuits ................................................................................................................................. 25

Summary of Contents for A4AC4018A

Page 1: ...and training Improperly installed adjusted or altered equipment by an unqualified person could result in death or serious injury When working on the equipment observe all pre cautions in the literatu...

Page 2: ...d Failure to use proper service tools may result in equipment damage or personal injury SERVICE USE ONLY R 410A REFRIGERANT AND AP PROVED POE COMPRESSOR OIL WARNING WARNING LIVE ELECTRICAL COMPONENTS...

Page 3: ...nt Line Routing 8 Section 7 Refrigerant Line Brazing 9 Section 8 Refrigerant Line Leak Check 11 Section 9 Evacuation 11 Section 10 Service Valves 12 Section 11 Electrical Low Voltage 13 Section 12 Ele...

Page 4: ...ftware Program 32 3312 03 or latest revi sion When mounting the outdoor unit on a roof be sure the roof will support the unit s weight Properly selected isolation is recommended to alleviate sound or...

Page 5: ...onable Position the outdoor unit a minimum of 12 from any wall or surrounding shrubbery to ensure adequate airflow Outdoor unit location must be far enough away from any structure to prevent excess ro...

Page 6: ...e Vapor Line Connection Liquid Line Connection A4AC4018A 3 4 3 8 3 4 3 8 A4AC4023A 3 4 3 8 3 4 3 8 A4AC4024A 3 4 3 8 3 4 3 8 A4AC4030A 3 4 3 8 3 4 3 8 A4AC4036A 3 4 3 8 3 4 3 8 A4AC4042A 7 8 3 8 7 8 3...

Page 7: ...5 4 Refrigerant Line Insulation Important The Vapor Line must always be insulated DO NOT allow the Liquid Line and Vapor Line to come in direct metal to metal contact Vapor Line Liquid Line Insulatio...

Page 8: ...uld be insulated and isolated Isolate the lines from all ductwork Minimize the number of 90 turns Comply with National State and Local Codes when isolating line sets from joists rafters walls or other...

Page 9: ...ctwork Isolator Line Set Section 7 Refrigerant Line Brazing 7 1 Braze The Refrigerant Lines STEP 1 Remove caps or plugs Use a debur ing tool to debur the pipe ends Clean both internal and external sur...

Page 10: ...ntil all brazing is completed Important Remove the wet rag before stopping the dry nitrogen purge Note Install drier in Liquid Line NOTE NOTE Precautions should be taken to avoid Precautions should be...

Page 11: ...TEP 1 Pressurize the refrigerant lines and evaporator coil to 150 PSIG using dry nitrogen 150 PSIG Section 9 Evacuation 9 1 Evacuate the Refrigerant Lines and Indoor Coil Important Do not open the ser...

Page 12: ...P 3 Replace the valve stem cap to prevent leaks Tighten finger tight plus an additional 1 6 turn 10 2 Open the Liquid Service Valve Important Leak check and evacuation must be completed before opening...

Page 13: ...G 300 Ft 11 2 Low Voltage Hook up Diagrams R G B W1 W2 R B O Y X2 R G B C O Y W HEAT PUMP SYSTEMS Blue 24 VAC HOT FAN 24 VAC Common SOV COOL HEAT 1st STAGE HEATING 2nd STAGE EMERGENCY HEAT Thermostat...

Page 14: ...ly one stage of heat If equipped with second stage heat When using a BK enabled comfort control cut BK jumper and bypass Y and YLo at the furnace Connect BK from comfort control to BK of the furnace T...

Page 15: ...igh Voltage Ground Ground the outdoor unit per national state and local code requirements LIVE ELECTRICAL COMPONENTS During installation testing servicing and troubleshooting of this product it may be...

Page 16: ...t s to apply power to the indoor and outdoor units STEP 5 Set system thermostat to ON OFF DONE CANCEL ON OFF STEP 4 Wait one 1 hour before starting the unit if compressor crankcase heater acces sory i...

Page 17: ...he refrigerant line total length and lift measurements from Section 5 and use line length adders as shown in Section 5 2 if required Total Line Length __________ Ft Vertical Change Lift __________ Ft...

Page 18: ...LINE LENGTH FEET REFRIGERANT LINE LIFT FEET 10 20 25 30 40 60 Add 4 of Subcooling Add 3 of Subcooling Add 2 of Subcooling Add 1 of Subcooling Use Design Subcool Value 60 50 40 30 25 20 15 10 0 SUBCOO...

Page 19: ...ressure should be ap proximately 327 PSI This is the shown as the intersection of the Final Subcooling column and the Liquid Temperature row Table 14 2 8 9 10 11 12 13 14 179 182 185 188 191 195 198 1...

Page 20: ...331 336 95 331 336 341 346 351 355 360 100 355 360 365 370 376 381 386 105 381 386 391 396 402 407 413 110 407 413 418 424 429 435 441 115 435 441 446 452 458 464 470 120 464 470 476 482 488 495 501 1...

Page 21: ...25 27 28 30 31 95 4 6 8 10 13 14 16 18 20 22 23 25 26 28 29 100 6 8 10 12 13 16 18 20 21 23 25 27 29 105 4 6 7 9 11 13 15 18 20 22 24 26 28 110 4 7 9 11 13 16 18 21 23 26 28 115 6 9 12 14 16 19 21 24...

Page 22: ...Checkout Procedures and Troubleshooting 15 1 Operational And Checkout Procedures CHECKOUT PROCEDURE After installation has been completed it is recommended that the entire system be checked against t...

Page 23: ...re possible short in field wiring Jumper R to Y low voltage terminals at thermostat sub base Does the contactor energize NO Repair or replace connecting wiring YES Go To Compressor won t run Replace t...

Page 24: ...or NO Check for locked rotor Is voltage present at C to S and C to R with locked rotor amps on C YES Check Start Capacitor and Relay if present and Run Capacitor Do the start components and run capaci...

Page 25: ...O L T A G E F U S E S T U C K C O M P R E S S O R I N E F F I C I E N T C O M P R E F U N D E R C H A R G E R E F O V E R C H A R G E E X C E S S I V E E V A P L O A D N O N C O N D E N S A B L E S R...

Page 26: ...26 88 A4AC4001 1G EN 2 1 2 Ton Units Accumulator 2 3 Ton Units PRINTED FROM D157394P01...

Page 27: ...88 A4AC4001 1G EN 27 3 1 2 4 Ton Units PRINTED FROM D158514P01 5 Ton Units PRINTED FROM D158515P01...

Page 28: ...com The AHRI Certified mark indicates company participation in the AHRI Certification program For verification of individual certified products go to ahridirectory org The manufacturer has a policy o...

Reviews: