Installer’s Guide
Introduction
Contents
Safety Considerations
2
Introduction 3
Step 1-Inspect Shipment
3
Step 2-Determine Unit Clearances
4
Step 3-Review Location & Recommendation
Information
16
Step 4-Unit Installation
17
Ground Level Installation
17
Rooftop Installation -- Curb Mounting
17
Covert Horizontal Airflow to Down Airflow
17
Install Full Perimeter Roof Mounting Curb
17
Lifting and Rigging
18
Placing the Unit on the Mounting Curb
18
Rooftop Installation -- Frame Mounting
19
Rooftop Installation -- No Curb/Frame
19
Ductwork Installation
22
Attaching Downflow Ductwork to Roof Curb
22
Attaching Horizontal Ductwork to Unit
22
Condensate Drain Piping
22
Air Filter Installation
22
Electrical Wiring
23
Electrical Connections
23
Electrical Power
23
Disconnect Switch
23
Overcurrent Protection
23
Power Wiring
23
Field Wiring Diagram
24
Control Wiring (Class II)
25
Step 5-Unit Startup
25
Pre-start Quick Checklist
25
Starting the Unit in the Cooling Mode
25
Operating Pressures
25
Voltage Check
25
Cooling Shut Down
25
Starting the Unit in Heating Mode
26
Heating Shutdown
26
Sequence of Operation
26
Demand Defrost Operation
26
Defrost Control
26
Final Installation Checklist
27
Maintenance 27
Owner Maintenance
27
Service Maintenance
27
Cooling Season
27
Heating Season
27
Indoor Fan Motor Speed Tap Setting
27
Read this manual carefully before attempting to install, oper-
ate, or perform maintenance on this unit. Installation and
maintenance should be performed by qualified service techni-
cians only. This unit is listed by Underwriters Laboratory.
Model 2/4WC*3 heat pump units are designed for outdoor
mounting with a vertical condenser discharge. They can be
located either at ground level or on a roof in accordance with
local codes. Each unit contains an operating charge of refrig-
erant as shipped.
Extreme mounting kits are available for slab (BAYEX-
MK003A), utility curb (BAYEXMK002B) and perimeter curb
(BAYEXMK001A) mountings.
This guide is organized as follows:
Step 1 - Inspect Shipment
Step 2 - Determine Unit Clearances
Step 3 - Review Location & Recommendation Information
Step 4 - Unit Installation
Step 5 - Unit Startup
Sequence of Operation
Maintenance
Step 1—Inspect Shipment
1. Check for damage after the unit is unloaded. Report promptly
to the carrier any damage found to the unit. Do not drop the
unit.
IMPORTANT:
To prevent damage to the sides and top of the
unit when hoisting, retain the top shipping skid on the unit or
use “spreader bars” as shown on page 20.
2. Check the unit’s nameplate to determine if the unit is cor-
rect for the intended application. The power supply must be
adequate for both the unit and all accessories.
3. Check to be sure the refrigerant charge has been retained
during shipment. Remove the Compressor access panel to
access the 1/4" flare pressure taps.
4. If this unit is being installed on a curb, verify that the correct
curb is provided with the unit.
•
4WC*3018-036 use model BAYCURB050A.
•
4WC*3042-060 use model BAYCURB051A.
5. If the unit is being hoisted, accessory kit BAYLIFT002A is
recommended. It includes a kit of four (4) lifting lugs and
instructions.
NOTE:
If practical, install any internal accessories to the
unit at the shop.
Summary of Contents for 18-EB24D1-19
Page 5: ...Page 5 Installer s Guide Figure 2 4WCC3018 through 4WCC3036 2 of 3 ...
Page 6: ...Page 6 Installer s Guide Figure 3 4WCC3018 through 4WCC3036 3 of 3 ...
Page 8: ...Page 8 Installer s Guide Figure 5 4WCC3042 through 4WCC3060 2 of 3 ...
Page 9: ...Page 9 Installer s Guide Figure 6 4WCC3042 through 4WCC3060 3 of 3 ...
Page 11: ...Page 11 Installer s Guide Figure 8 4WCX3018 through 2 4WCX3036 2 of 3 ...
Page 12: ...Page 12 Installer s Guide Figure 9 4WCX3018 through 4WCX3036 3 of 3 ...
Page 14: ...Page 14 Installer s Guide Figure 11 4WCX3042 through 4WCX3060 2 of 3 ...
Page 15: ...Page 15 Installer s Guide Figure 12 4WCX3042 through 4WCX3060 3 of 3 ...