94
CVHE-SVX005B-EN
Evaporator
Since the evaporator is typically part of a closed circuit,
it may not accumulate appreciable amounts of scale or
sludge. Normally, cleaning every three years is
sufficient. However, periodic inspection and cleaning is
recommended on open evaporator systems, such as air
washers.
Waterbox and Tubesheet Protective
Coatings
Trane recommends that coated waterboxes/tubesheets
—regardless of the type of protective coating included
—be taken out of service within the first one to three
months of operation for inspection. Any voids or
defects identified upon inspection must be repaired. If
the water quality is known to be highly supportive of
corrosion (i.e., sea water, etc.), inspect the coating
system at one month; if the water quality is known to
be relatively benign (i.e., normal treated and clean
condenser water), inspect the coating system within
three months. Only when initial inspections show no
problems are present should subsequent maintenance
intervals be increased.
Sacrificial Anodes
The replacement schedule for the optional zinc or
magnesium anodes can vary greatly with the
aggressiveness of the water that is in the system. Some
sites could require anode replacement every two to
three months while other sites may require anode
replacement every two to three years. Trane
recommends inspection of anodes for wear sometime
within the first several months of the anodes being
placed into service. If the observed loss of anode
material is small, then the interval between subsequent
inspections can be lengthened. Replace the anode and/
or shorten the inspection interval if the anode has lost
50 percent or more of its original mass. If anode
depletion occurs very quickly, consult a water
treatment specialist to determine if the anode material
selected is correct for the application.
N
NO
OT
TIIC
CE
E
E
Eq
qu
uiip
pm
me
en
ntt D
Da
am
ma
ag
ge
e!!
F
Fa
aiillu
urre
e tto
o ffo
ollllo
ow
w iin
nssttrru
uccttiio
on
nss cco
ou
ulld
d rre
essu
ulltt iin
n
e
eq
qu
uiip
pm
me
en
ntt d
da
am
ma
ag
ge
e..
D
Do
o N
NO
OT
T u
usse
e T
Te
effllo
on
n--b
ba
asse
ed
d tta
ap
pe
e o
orr p
pa
asstte
e o
on
n a
an
no
od
de
e;;
a
a ssm
ma
allll a
am
mo
ou
un
ntt o
off lliiq
qu
uiid
d sse
ea
alla
an
ntt ((L
Lo
occttiitte
e®
® 2
24
42
2 o
orr
e
eq
qu
uiiv
va
alle
en
ntt)) m
ma
ay
y b
be
e a
ap
pp
plliie
ed
d tto
o p
prre
ev
ve
en
ntt lle
ea
akka
ag
ge
e
w
wh
he
en
n iin
nsstta
alllliin
ng
g a
an
n a
an
no
od
de
e,, b
bu
utt d
do
o n
no
ott a
ap
pp
plly
y sso
o
m
mu
ucch
h sse
ea
alla
an
ntt tth
ha
att iitt p
prre
ev
ve
en
nttss tth
he
e n
ne
ecce
essssa
arry
y
e
elle
eccttrriicca
all cco
on
nn
ne
eccttiio
on
n b
be
ettw
we
ee
en
n tth
he
e a
an
no
od
de
e a
an
nd
d tth
he
e
w
wa
atte
errb
bo
ox
x..
As needed after draining the waterbox, use a 2-1/2 in.
(63.5 mm) wrench to remove/install Trane-supplied
waterbox anodes.