Trane Technologies BAYCOSW310A Installation Manual Download Page 4

4

RT-SVN035A-EN

Pre-Installation

Unit Inspection

To protect against loss due to damage incurred in
transit, perform inspection immediately upon receipt of
the unit.

Exterior Inspection

If the job site inspection reveals damage or material
shortages, file a claim with the carrier immediately.
Specify the type and extent of the damage on the bill of
lading before signing. Notify the appropriate sales
representative.

IIm

mp

po

orrtta

an

ntt:: Do not proceed with installation of a

damaged unit without sales
representative’s approval.

Visually inspect the complete exterior for signs of
shipping damages to unit or packing material.

Verify that the nameplate data matches the sales
order and bill of lading.

Verify that the unit is properly equipped and there
are no material shortages.

Verify that the power supply complies with the unit
nameplate specifications.

Inspection for Concealed Damage

Visually inspect the components for concealed damage
as soon as possible after delivery and before it is
stored.

If concealed damage is discovered:

Notify the carrier’s terminal of the damage
immediately by phone and by mail.

Concealed damage must be reported within 15
days.

Request an immediate, joint inspection of the
damage with the carrier and consignee.

Stop unpacking the unit.

Do not remove damaged material from receiving
location.

Take photos of the damage, if possible.

The owner must provide reasonable evidence that
the damage did not occur after delivery.

Parts List

Drain pan overflow switch

Fixed sheet metal

Screws and cable ties

Main Components

Figure 1. Wire routing location

Summary of Contents for BAYCOSW310A

Page 1: ...training Improperly installed adjusted or altered equipment by an unqualified person could result in death or serious injury When working on the equipment observe all precautions in the literature and on the tags stickers and labels that are attached to the equipment May 2021 R RT T S SV VN N0 03 35 5A A E EN N Installation Guide Drain Pan Overflow Switch Used with Medium Foundation Light Commerci...

Page 2: ... r t th he e j jo ob b b be ei in ng g u un nd de er rt ta ak ke en n c co ou ul ld d r re es su ul lt t i in n d de ea at th h o or r s se er ri io ou us s i in nj ju ur ry y T Te ec ch hn ni ic ci ia an ns s i in n o or rd de er r t to o p pr ro ot te ec ct t t th he em ms se el lv ve es s f fr ro om m p po ot te en nt ti ia al l e el le ec ct tr ri ic ca al l m me ec ch ha an ni ic ca al l a an...

Page 3: ...o ou ut t r re ef fr ri ig ge er ra an nt t h ha an nd dl li in ng g e et tc c W Wh he er re e l lo oc ca al l r re eg gu ul la at ti io on ns s a ar re e m mo or re e s st tr ri in ng ge en nt t t th ha an n t th he es se e p po ol li ic ci ie es s t th ho os se e r re eg gu ul la at ti io on ns s s su up pe er rs se ed de e t th he es se e p po ol li ic ci ie es s N No on n T Tr ra an ne e p pe ...

Page 4: ...d bill of lading Verify that the unit is properly equipped and there are no material shortages Verify that the power supply complies with the unit nameplate specifications Inspection for Concealed Damage Visually inspect the components for concealed damage as soon as possible after delivery and before it is stored If concealed damage is discovered Notify the carrier s terminal of the damage immedi...

Page 5: ...h h a a C CA AT T I II II I o or r I IV V v vo ol lt tm me et te er r r ra at te ed d p pe er r N NF FP PA A 7 70 0E E t th ha at t a al ll l c ca ap pa ac ci it to or rs s h ha av ve e d di is sc ch ha ar rg ge ed d F Fo or r a ad dd di it ti io on na al l i in nf fo or rm ma at ti io on n r re eg ga ar rd di in ng g t th he e s sa af fe e d di is sc ch ha ar rg ge e o of f c ca ap pa ac ci it to...

Page 6: ...ure 6 Crossing and binding wires 6 Disconnect the XS8 from XP8 and connect the switch signal wire See diagram Figure 7 Connecting switch signal wire Figure 8 Connection switch location I In ns st ta al ll la at ti io on n ...

Page 7: ...RT SVN035A EN 7 Figure 9 Electrical diagram 7 Install access panels A and B I In ns st ta al ll la at ti io on n ...

Page 8: ...nformation please visit trane com or americanstandardair com Trane and American Standard have a policy of continuous product and product data improvement and reserve the right to change design and specifications without notice We are committed to using environmentally conscious print practices RT SVN035A EN 28 May 2021 Supersedes New 2021 ...

Reviews: