Pre-Installation
Unit Inspection
To protect against loss due to damage incurred in
transit, perform inspection immediately upon receipt of
the unit.
Exterior Inspection
If the job site inspection reveals damage or material
shortages, file a claim with the carrier immediately.
Specify the type and extent of the damage on the bill of
lading before signing. Notify the appropriate sales
representative.
IIm
mp
po
orrtta
an
ntt:: Do not proceed with installation of a
damaged unit without sales
representative’s approval.
•
Visually inspect the complete exterior for signs of
shipping damages to unit or packing material.
•
Verify that the nameplate data matches the sales
order and bill of lading.
•
Verify that the unit is properly equipped and there
are no material shortages.
•
Verify that the power supply complies with the unit
nameplate specifications.
Inspection for Concealed Damage
Visually inspect the components for concealed damage
as soon as possible after delivery and before it is
stored.
If concealed damage is discovered:
•
Notify the carrier’s terminal of the damage
immediately by phone and by mail.
•
Concealed damage must be reported within 15
days.
•
Request an immediate, joint inspection of the
damage with the carrier and consignee.
•
Stop unpacking the unit.
•
Do not remove damaged material from receiving
location.
•
Take photos of the damage, if possible.
•
The owner must provide reasonable evidence that
the damage did not occur after delivery.
Parts List
•
Drain pan overflow switch
•
Fixed sheet metal
•
Screws and cable ties
Main Components