Inverting Door Aperture (MODEL 300 & 500)
The door can be opened in either direction (RH or LH). For the door height adjustments see figure
below.
Inverting Door Aperture (models 750 - 2000)
If the door is to be opened from the opposite side:
1.
Switch the outside nut (or bush) of one hinge with the diametrically opposite closure bush; then at
the hinge side, fasten the cone to the door with the inside nut.
2.
Repeat the operation for the other hinge.
3.
For any adjustment needed, act on the specific hinge nuts.
Pressurized Boiler Connection
Before installation, clean the inside of all the fuel supply pipes, to remove any residues that might
compromise correct boiler operation. Check the maximum combustion chamber pressure, as shown in
the technical characteristics table. Make the following checks:
1.
Check the internal and external fuel supply system for any leaks;
2.
Adjust the fuel supply rate as to the required boiler heat rating;
3.
Check that the boiler is supplied with the type of fuel for which it has been arranged;
4.
Check that the fuel supply pressure is within the values shown on the burner data plate;
5.
Check that the fuel supply system is dimensioned adequately for the fuel supply rate that the boiler
requires, and that the fuel supply system is complete with all the safety and control devices foreseen
by current applicable regulations.
6.
In particular for the use of gas:
7.
Check that the gas line and collector pipes conform to current applicable standards and regulations;
8.
Check that all gas connections are perfectly gas-tight;
Summary of Contents for Triumph 1000
Page 14: ...14 TRIAD Boiler Systems Inc West Chicago IL www triadboiler com Handling Options ...
Page 20: ...20 TRIAD Boiler Systems Inc West Chicago IL www triadboiler com Model 300 500 Model 750 1000 ...
Page 27: ...27 TRIAD Boiler Systems Inc West Chicago IL www triadboiler com 2 6 Example wiring diagrams ...