Steps for Installation:
1. Switch power OFF at meter box.
2. Refer to FIG 1. Use the holes (A) on the Mounting Base (B) to mark the position of the
fixing screws on the selected mounting surface once the mounting position has been
established.
3. If wall pugs are to be used for securing the base of the unit, drill to a depth of
approximately 40mm, and fit the supplied plastic wall plugs as appropriate. Take care not
to drill into concealed electrical wiring or other services. Wall plugs must be pushed in
until flush.
4. Drill suitable sized hole for cabling in mounting surface between the other two mounting
holes for electrical connections (C).
5. Ensure gasket is positioned over wiring before connecting (D).
6. Pull through electrical wiring in preparation for connection to the sensor.
7. Connect the Active incoming supply connection to the terminal block connection marked
“L’’, as per FIG 2.
8. Wire the incoming supply Neutral and the load Neutral connection to the terminal block
connection marked “N’’, as per FIG 2.
9. Wire the load active connection to the switched Active output connection on the terminal
block marked “S”, as per FIG 2.
NOTE: Installation must be carried out according to Australian Wiring Rules (AS/NZS 3000).
Please refer to the wiring diagram in FIG 3.
10. Remove protective backing from self-adhesive foam gasket (D) as per FIG 1.
11. Attach the self-adhesive foam gasket to the mounting surface or rear of base, aligning
holes in the gasket (E) to the wall plugs as per FIG 1.
12. Fit the sensor mounting base (B) to the wall using screws provided and ensure tightly
secured to maintain IP rating and also tighten adjusting nuts to seal the cable and lock the
head in place.
13. Ensuring that associated lighting loads are correctly installed according to Australian
Wiring Rules.
14. Reconnect power.
FIG 2
FIG 3
Removable terminal block